PROJECT DETAILS

Project Submission No. S00695
Project Title Tire Biogas Plant Project
Project Owner (as per PSF & LOA) 1. Enfaş Enerji Elektrik Üretim A.Ş 2. GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DANIŞMANLIK VE TİCARET A.S
Submission Date 20 Aug 2020
Global Stakeholder Consultation Period 8 Dec 2022 - 22 Dec 2022
Sector 13.Waste handling and disposal
Project Type Biogas
GCC/CDM Methodology & Version GCCM003-Methodology-for-Energy-Generation-from-Animal-Manure-and-Waste-Management-Projects-v1
Forecasted GHG Emission Reduction (tCO2e/Year) 91,866 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Country Türkiye
Focal Point of Project Owners (FP)
GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S
Email of Contact Person of FP (Primary) kemal.demirkol@gte.com.tr
Email of Contact Person of FP (Secondary) engin.koc@gte.com.tr
Name of Authorized External Representative Organization N/A
Name of Focal Point of External Representative N/A
Email-id of External representative N/A
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Tire Biogas Plant Project was constructed by ENFAŞ Enerji Elektrik Üretim A.Ş. (Subsidiary of SÜTAŞ) in Tire Organized Industrial Zone (TOIZ) in İzmir, Turkey. The main feedstock for the BPP is manure and wastewater of milk and milk products factories in Tire Organized Industrial Zone. The digesters and equipment are also designed to utilize other wastes in the region causing by agricultural or industrial activities which are also renewable biomass resources such as potate or sugar beet wastes. Based on the information stated in the EIA, aroung 800 tonnes/ day organic waste will be used in the biogas power plant. As per the initial conditions, methane emission potential caused from both anaerobic treatment of the wastewater and manure in open lagoons are calculated as 13.847 m3/day and 9.180 m3/day respectively. The project will have an initial installed capacity of 6.750 MWm / 6.402 MWe but the plant uses 4.380 MWm / 4.268 MWe with an expected output of 21.785 GWh of electricity (as per capacity report of the project) and 21.536 GWh of heat. Plant capacity is planned to reach up to 7MW upon installation of new units. By regarding the future plans waste handling& disposal will tend to > 60,000 tCO2 per annum and the both electricity and heat generation will increase accordingly. Hence, the project can be classified as a large scale project.The project site is bought from the Tire Organized Industrial Zone (TOIZ) by Sütaş Süt Ürünleri A.Ş.

Additional Information

Sectorial Scopes of the Project are

Scope 1 : Energy (renewable/non-renewable sources)

Scope 13. Waste Handling and Disposal  

Scope 15. Agriculture. Since the project submission page allows to choose only one Scope, Scope 13 is chosen and Scope 15 is additionally mentioned here.