Project Submission No. | S00342 |
---|---|
Project Title | 110 MW Solar Energy Project in Noorsar |
Project Owner (as per PSF & LOA) | Tata Power Renewable Energy Limited, TP Saurya Limited |
Submission Date | 24 Jun 2022 |
Global Stakeholder Consultation Period | 8 Sep 2022 - 22 Sep 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | ACM0002- Grid-connected electricity generation from renewable sources, Version -21 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 243,627 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Location Details Open Full Map
|
|
Country | India |
---|---|
Focal Point of Project Owners (FP)
|
Tata Power Renewable Energy Limited |
Email of Contact Person of FP (Primary) | sivanarayana@tatapower.com |
Email of Contact Person of FP (Secondary) | prashant.tiwari@tatapower.com |
Email-id of External representative | prashant.tiwari@tatapower.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | The Project activity is greenfield installation of 110 MW (AC) Solar Power plant for power generation and supply to the Kerala State Electricity Board Limited (KSEBL) through Indian Grid. The project activity is commissioned on 29/05/2023 & located in Noorsar village, Rajasthan and produces 261,823 MWh/annum of electricity and inject into the National grid and thereby reducing 243,627 tCO2 /annum into atmosphere that accounts to 2,436,275 tCO2 for 10 years of crediting period, that would have been produced by fossil fuel mix-based power generation plants in the India grid. The baseline and the pre project scenario are the same for the project activity, as the project is a new greenfield installation and there is no happening in the absence of the project activity. |
---|---|
Additional Information | The project activity generates power at project site Noorsar Village in Bikaner, District, Rajasthan and fed into national grid. |
Opinion | LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “110 MW Solar Energy Project in Noorsar”. The verification is performed on the basis of GCC criteria Project Verification Standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting. |
---|---|
Report (Public) | Verification Report (public) |
Verification report date | 2024-02-06 |
First Request for Registration Date | 2023-09-07 |