| Project Submission No. | S00342 |
|---|---|
| Project Title | 110 MW Solar Energy Project in Noorsar |
| Project Owner(s) (as per PSF & LOA) | Tata Power Renewable Energy Limited |
| Submission Date | 2022-06-24 |
| Global Stakeholder Consultation Period |
2022-09-08 to 2022-09-22 |
| Registration Date | 2024-09-12 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | ACM0002- Grid-connected electricity generation from renewable sources, Version -20 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | |
| Verified Market Eligibility |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Tata Power Renewable Energy Limited |
| Email of Contact Person of FP (Primary) | sivanarayana@tatapower.com |
| Email of Contact Person of FP (Secondary) | prashant.tiwari@tatapower.com |
| Email-id of External representative | prashant.tiwari@tatapower.com |
| Project Verifier | LGAI TECHNOLOGICAL CENTER, S.A. |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The Project activity is greenfield installation of 110 MW (AC) Solar Power plant for power generation and supply to the Kerala State Electricity Board Limited (KSEBL) through Indian Grid. The project activity is commissioned on 29/05/2023 & located in Noorsar village, Rajasthan and expected to produce 261,823 MWh/annum over the fixed crediting period of 10 years. of electricity and inject into the National grid and thereby reducing 243,627 tCO2 /annum over the fixed crediting period of 10 years into atmosphere that accounts to 2,436,274 tCO2 for 10 years of fixed crediting period, that would have been produced by fossil fuel mix-based power generation plants in the India grid. The baseline and the pre project scenario are the same for the project activity, as the project is a new greenfield installation and there is no happening in the absence of the project activity. |
|---|
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2024-08-26 |
| First Request for Registration Date | 2023-09-07 |
| Opinion | LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “110 MW Solar Energy Project in Noorsar”. The verification is performed on the basis of GCC criteria Project Verification Standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting. |