Project Submission No. | S00657 |
---|---|
Project Title | 225 MW Solar Energy Project in Noorsar |
Project Owner(s) (as per PSF & LOA) | Tata Power Renewable Energy Limited |
Submission Date | 2022-06-24 |
Global Stakeholder Consultation Period |
2022-11-30 to 2022-12-14 |
Registration Date | 2025-01-10 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | ACM0002,Version 21 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Verified GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Verified E+ Label | Yes |
Forecasted S+ Label | Yes |
Verified S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Verified SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Verified SDG+ Label | Silver |
Forecasted Market Eligibility | |
Verified Market Eligibility |
Location Details
Open Full Map
|
|
Country |
India
|
---|---|
Focal Point of Project Owners
|
Tata Power Renewable Energy Limited |
Email of Contact Person of FP (Primary) | sivanarayana@tatapower.com |
Email of Contact Person of FP (Secondary) | prashant.tiwari@tatapower.com |
Project Verifier | LGAI TECHNOLOGICAL CENTER, S.A. |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
Request for Registration Form | Registration Form |
Project Brief | The Project activity is new green- field installation of 225 MW Solar Power plant for power generation and supply to the National Grid by Tata Power Green Energy Private Limited . The project activity occurs in Noorsar village, Rajasthan and produces the estimated annual average electricity generation over the fixed crediting period of 10 years is 541,502 MWh per Annum of electricity. |
---|---|
Additional Information | The generated electricity from the fossil-fuel based power plants is displaced by the project activity and thus the project activity is expected to reduce 504,150 tCO2eGHG emissions annually and 5,041,504 tCO2e over the entire crediting period of 10 years and that would have been produced by fossil fuel based Thermal generation plant in the National grid. |
Report (Public) | Verification Report (public) |
---|---|
Verification report date | 2025-01-09 |
First Request for Registration Date | 2023-11-30 |
Opinion | LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “225 MW Solar Energy Project in Noorsar”. The verification is performed on the basis of GCC criteria Project Verification Standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting. |