PROJECT DETAILS

Project Submission No. S00365
Project Title 150 MW Solar Project in Jaisalmer, Rajasthan
Project Owner (as per PSF & LOA) Tata Power Renewable Energy Limited
Submission Date 24 Jun 2022
Global Stakeholder Consultation Period 13 Sep 2022 - 27 Sep 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002- Grid-connected electricity generation from renewable sources, Version -21
Forecasted GHG Emission Reduction (tCO2e/Year) 343,797 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Location Details Open Full Map
Country India
Focal Point of Project Owners (FP)
Tata Power Renewable Energy Limited
Email of Contact Person of FP (Primary) sivanarayana@tatapower.com
Email of Contact Person of FP (Secondary) prashant.tiwari@tatapower.com
Email-id of External representative prashant.tiwari@tatapower.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The proposed project activity green field project. the installation of a new grid-connected 150 MW Solar power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity. The project activity is solar power project, which is being implemented in Jaisalmer, Rajasthan of India by Tata Power Renewable Energy Limited. The electricity generated from Project Activity is exported to the Indian grid there by displacing the consumption of electricity from the regional grid electricity distribution system.

 

Additional Information

The project shall result in replacing anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 343,797 tCO2 per year, thereon displacing 369,278 MWh/year amount of electricity from the unified Indian grid. The project activity aims to harness solar energy through installation of Solar PV project with total installed capacity of 150 MW.

VERIFICATION OUTCOME
Opinion

The GCC Project Verifier, LGAI Technological Center S.A., has verified and certified that the GCC Project Activity – ‘150 MW Solar Project in Jaisalmer, Rajasthan’ has correctly described the Project Activity in the Project Submission Form (version 3.0), dated 31/03/2023 including the applicability of the approved methodology ACM0002 version 21.0. and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction  estimates correctly and conservatively; is likely to generate GHG emission reductions amounting to the estimated 343,797 tCO2e annual average, as indicated in the PSF which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3 and therefore requests the GCC Program to register the Project Activity; is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard and contribute to achieving a total of 4 SDGs, which is likely to achieve the Gold SDG certification label (SDG+).

Report (Public) Verification Report (public)
Verification report date
First Request for Registration Date 2023-07-25
© 2024 Global Carbon Council