PROJECT DETAILS

Project Submission No. S00438
Project Title 100 MW solar power project in Partur, Maharashtra
Project Owner (as per PSF & LOA) Tata Power Renewable Energy Limited, TP Kirnali Limited
Focal Point of Project Owners*(FP)
Tata Power Renewable Energy Limited
Email of Contact Person of FP (Primary) sivanarayana@tatapower.com
Email of Contact Person of FP (Secondary) prashant.tiwari@tatapower.com
Country India
Submission Date 24 Jun 2022
Global Stakeholder Consultation Period 28 Sep 2022 - 12 Oct 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0
Forecasted GHG Emission Reduction(TCO2/Year) 208,066
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 3, SDG 5,SDG 7,SDG 8, SDG 9
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

The proposed project activity is the installation of a new grid-connected 100 MW Solar power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project activity is solar power project which is being implemented in Village of Partur, Jalra District Maharashtra of India by TP Kirnali Limited. The electricity generated from Project Activity is exported to the Indian grid there by displacing the consumption of electricity from the regional grid electricity distribution system.
The electricity generated by the project “TP Kirnali Limited” will thus replace the equivalent amount of electricity generated by the operation of existing grid connected power plants (mostly fossil fuel-based power plants). In this scope TP Kirnali Limited planned to install Solar Panels in with the purpose of contributing to the national economy. The estimated annual average electricity generation by the project activity is 223,604 MWh.The project was commissioned on 25/05/2022
 

Additional Information

The crediting period chosen for the project activity “TP Kirnali Limited” is 10 years Crediting Period in which total GHG emission reduction estimated is 2,080,664 tCO2e. The annual average estimated emission reductions from project activity is 208,066 tCO2e/annum.