PROJECT DETAILS

Project Submission No. S00438
Project Title 100 MW solar power project in Partur, Maharashtra
Project Owner(s) (as per PSF & LOA) Tata Power Renewable Energy Limited
Submission Date 2022-06-24
Global Stakeholder Consultation Period 2022-09-28 to
2022-10-12
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources — Version 20.0,
Forecasted GHG Emission Reduction (tCO2e/Year) 191,315
Forecasted E+ Label Yes
Verified E+ Label
Forecasted S+ Label Yes
Verified S+ Label
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility
Location Details Open Full Map
Country
 India
Focal Point of Project Owners
Tata Power Renewable Energy Limited
Email of Contact Person of FP (Primary) sivanarayana@tatapower.com
Email of Contact Person of FP (Secondary) prashant.tiwari@tatapower.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The project activity is the installation of a new grid-connected Solar power plant/unit of AC capacity 100 MW at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project activity is solar power project which is being implemented in Amba Village of Partur Taluka, Jalna District of Maharashtra state of India by Tata Power Renewable Energy Limited. The electricity generated from Project Activity is exported to the Indian grid there by displacing the consumption of electricity from the grid electricity distribution system, in the absence of the project activity.

Additional Information

The crediting period chosen for the project activity “100 MW solar power project in Partur, Maharashtra” is 10 years Crediting Period in which the total GHG emission reduction estimated is around 1,913,159 tCO2e. The annual average estimated emission reductions over the fixed crediting period from project activity is 191,315 tCO2/Annum.