PROJECT DETAILS

Project Submission No. S00567
Project Title Premier Photovoltaic bundled Solar PV Power projects at Telangana, India
Project Owner (as per PSF & LOA) Premier Photovoltaic Medak Private Limited, Greenko Energies Private Limited
Submission Date 23 Jun 2022
Global Stakeholder Consultation Period 31 Oct 2022 - 14 Nov 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022)
Forecasted GHG Emission Reduction (tCO2e/Year) 53,578 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility CORSIA(C+)
Location Details Open Full Map
Country India
Focal Point of Project Owners (FP)
Greenko Energies Private Limited
Email of Contact Person of FP (Primary) muraliraju.m@greenkogroup.com
Email of Contact Person of FP (Secondary) seshagirirao.n@greenkogroup.com
Name of Authorized External Representative Organization Greenko Energies Private Limited
Name of Focal Point of External Representative M. Murali krishnam Raju
Email-id of External representative muraliraju.m@greenkogroup.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The proposed Project Activity is a bundled new grid-connected 36 MW solar power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (greenfield plant). The project has been implemented in state of Telangana in India by Premier Photovoltaic Medak Private Limited (PPMPL) with capacities 8 MW at Digwal, 8 MW at Sankapur, 10 MW at Chennur & 10 MW at Talamadla. Hence the state of Telangana is considered as geographical area and the Solar plant along with its connection to grid is the project boundary. The project is a SPV under Greenko Solar Energy Private Limited, which is a sister company of M/s Greenko Energies Private Limited. The bundled project activity is allotted to the project owner through state government competitive bidding process. The SPV names are changed to M/s Premier photovoltaic (Medak) Private Limited from M/s Saimeg infrastructure (Medak) private Limited, M/s Premier Kurnool solar private limited and M/s Saimeg infrastructure (Nizamabad) private Limited The electricity generated from Project Activity using solar radiation energy that converts sunlight into electricity using solar PV modules is exported to the Indian grid there by displacing the consumption of electricity from the regional grid electricity distribution system.

Additional Information
VERIFICATION OUTCOME
Opinion

The GCC Project Verifier, Carbon Check (India) Private Ltd, verifies and certifies that the GCC Project Activity “Premier Photovoltaic bundled Solar PV Power projects at Telangana, India”:
(a) has correctly described the Project Activity in the Project Submission Form (version 1.4, dated 26/10/2023) including the applicability of the approved GCC methodology, GCCM001, version 3.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;
(b) is likely to generate GHG emission reductions amounting to the estimated 535,778 tCO2e (for the fixed 10 years crediting period), as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules and therefore requests the GCC Program to register the Project Activity;
(c) is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, version 3.0 and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net harm Label (S+); and
(d) is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, version 3.0 and contribute to achieving a total of 6 SDGs, which is likely to achieve the Diamond SDG certification label (SDG+).
(e) complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v 1.3 paragraph 23-25, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project.
The Verification report describes a total of 19 findings, which include:
• 01 Forward Action Request (FAR);
• 11 Clarification Requests (CLs);
• 07 Corrective Action Requests (CARs)
All findings are resolved by the project owner (except the FAR which needs to be resolved during emission reduction verification).

Report (Public) Verification Report (public)