| Project Submission No. | S00629 |
|---|---|
| Project Title | 226.8 MW Wind Power Project at Amidyala in Anantapuram district, Andhra Pradesh, India. |
| Project Owner(s) (as per PSF & LOA) | Skeiron Renewable Energy Amidyala Limited and Greenko Energies Private Limited |
| Submission Date | 2022-06-23 |
| Global Stakeholder Consultation Period |
2022-11-23 to 2022-12-07 |
| Registration Date | 2026-08-13 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Wind Power |
| GCC/CDM Methodology & Version | GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022) |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
| Verified Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Greenko Energies Private Limited |
| Email of Contact Person of FP (Primary) | muraliraju.m@greenkogroup.com |
| Email of Contact Person of FP (Secondary) | seshagirirao.n@greenkogroup.com |
| Name of Authorized External Representative Organization | Greenko Energies Private Limited |
| Name of Focal Point of External Representative | M. Murali krishnam Raju |
| Email-id of External representative | muraliraju.m@greenkogroup.com |
| Project Verifier | Carbon Check (India) Private Limited |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The main purpose of this project activity is to generate electricity through renewable wind energy sources. Skeiron Renewable Energy Amidyala Limited is the owner of the proposed project activity and is a SPV under Greenko Energies Private Limited. The project activity involves installation of 108 wind energy generators (WEGs) each of 2.1 MW rated capacity in different villages as stated in section A.2 at Amidyala in Anantapuram district in the State of Andhra Pradesh (AP), India. Hence the state of Andhra Pradesh is considered as geographical area and the project boundary includes the spatial extent of project site where the plant has been installed, power evacuation infrastructure including the other power stations feeding to the connected electricity grid, energy metering points, switch yards and other civil constructs. |
|---|
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2026-08-13 |
| First Request for Registration Date | 2023-10-01 |
| Opinion | The GCC Project Verifier, Carbon Check (India) Private Ltd, verifies and certifies that the GCC Project Activity “226.8 MW Wind Power Project at Amidyala in Anantapuram district, Andhra Pradesh, India.”: (a) has correctly described the Project Activity in the Project Submission Form (version 1.4, dated 08/07/2024) including the applicability of the approved GCC methodology, GCCM001, version 4.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively; (b) is likely to generate GHG emission reductions amounting to the estimated 4,621,726 tCO2e (for the fixed 10 years crediting period), as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules and therefore requests the GCC Program to register the Project Activity; is not likely to cause any net-harm to the environment and/or society and complies with the (a) Environmental and Social Safeguards Standard, version 3.0 and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net harm Label (S+); and
(b) is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard, version 3.0 and contribute to achieving a total of 3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+).
(c) complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.3 paragraph 23-25, and the ACCs expected to be issued during the crediting period from 31/07/2017 till 31/12/2020 of this project activity is likely to be CORSIA eligible and may be used by International Airlines for offsetting their emissions during CORSIA Pilot Phase (2021-2023). As the project activity is a grid-connected renewable electricity generation project with a capacity exceeding 15 MW, it is not eligible for the CORSIA (C+) label for the First Phase (2024-2026), in accordance with the applicable CORSIA eligibility requirements. The Verification report describes a total of 39 findings, which include:
All findings are resolved by the project owner. |