Project Submission No. | S00629 |
---|---|
Project Title | 226.8 MW Wind Power Project at Amidyala in Anantapuram district, Andhra Pradesh, India. |
Project Owner(s) (as per PSF & LOA) | Skeiron Renewable Energy Amidyala Limited and Greenko Energies Private Limited |
Submission Date | 2022-06-23 |
Global Stakeholder Consultation Period |
2022-11-23 to 2022-12-07 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022) |
Forecasted GHG Emission Reduction (tCO2e/Year) | 462,173 |
Forecasted E+ Label | Yes |
Verified E+ Label | |
Forecasted S+ Label | Yes |
Verified S+ Label | |
Forecasted SDG+ Goals | |
Verified SDG+ Goals | |
Forecasted SDG+ Label | Platinum |
Verified SDG+ Label | |
Forecasted Market Eligibility | C+ - Pilot Phase |
Verified Market Eligibility |
Location Details
Open Full Map
|
|
Country |
India
|
---|---|
Focal Point of Project Owners
|
Greenko Energies Private Limited |
Email of Contact Person of FP (Primary) | muraliraju.m@greenkogroup.com |
Email of Contact Person of FP (Secondary) | seshagirirao.n@greenkogroup.com |
Name of Authorized External Representative Organization | Greenko Energies Private Limited |
Name of Focal Point of External Representative | M. Murali krishnam Raju |
Email-id of External representative | muraliraju.m@greenkogroup.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | The main purpose of this project activity is to generate electricity through renewable wind energy sources. Skeiron Renewable Energy Amidyala Limited is the owner of the proposed project activity and is a SPV under Greenko Energies Private Limited. The project activity involves installation of 108 wind energy generators (WEGs) each of 2.1 MW rated capacity in different villages as stated in section A.2 at Amidyala in Anantapuram district in the State of Andhra Pradesh (AP), India. Hence the state of Andhra Pradesh is considered as geographical area and the project boundary includes the spatial extent of project site where the plant has been installed, power evacuation infrastructure including the other power stations feeding to the connected electricity grid, energy metering points, switch yards and other civil constructs. |
---|