PROJECT DETAILS

Project Submission No. S00629
Project Title 226.8 MW Wind Power Project at Amidyala in Anantapuram district, Andhra Pradesh, India.
Project Owner(s) (as per PSF & LOA) Skeiron Renewable Energy Amidyala Limited and Greenko Energies Private Limited
Submission Date 2022-06-23
Global Stakeholder Consultation Period 2022-11-23 to
2022-12-07
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022)
Forecasted GHG Emission Reduction (tCO2e/Year) 462,173
Forecasted E+ Label Yes
Verified E+ Label
Forecasted S+ Label Yes
Verified S+ Label
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Platinum
Verified SDG+ Label
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility
Location Details Open Full Map
Country
 India
Focal Point of Project Owners
Greenko Energies Private Limited
Email of Contact Person of FP (Primary) muraliraju.m@greenkogroup.com
Email of Contact Person of FP (Secondary) seshagirirao.n@greenkogroup.com
Name of Authorized External Representative Organization Greenko Energies Private Limited
Name of Focal Point of External Representative M. Murali krishnam Raju
Email-id of External representative muraliraju.m@greenkogroup.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The main purpose of this project activity is to generate electricity through renewable wind energy sources. Skeiron Renewable Energy Amidyala Limited is the owner of the proposed project activity and is a SPV under Greenko Energies Private Limited. The project activity involves installation of 108 wind energy generators (WEGs) each of 2.1 MW rated capacity in different villages as stated in section A.2 at Amidyala in Anantapuram district in the State of Andhra Pradesh (AP), India. Hence the state of Andhra Pradesh is considered as geographical area and the project boundary includes the spatial extent of project site where the plant has been installed, power evacuation infrastructure including the other power stations feeding to the connected electricity grid, energy metering points, switch yards and other civil constructs.