PROJECT DETAILS

Project Submission No. S00625
Project Title Alamettin GHZW Solar Power Plant Bundle
Project Owner (as per PSF & LOA) 1. Solarpower Enerji Üretim A.Ş. 2. Gaia Climate Finansal Danışmanlık Hizmetleri ve Ticaret A.Ş. (Focal Point)
Focal Point of Project Owners*(FP)
Gaia Climate Finansal Danışmanlık Hiz. ve Tic. A.Ş.
Email of Contact Person of FP (Primary) gkaya@gaiaclimate.com
Email of Contact Person of FP (Secondary) furkanartik@gaiaclimate.com
Country Türkiye
Submission Date 23 Jun 2022
Global Stakeholder Consultation Period 23 Nov 2022 - 7 Dec 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I D Small Scale Methodology: Grid connected renewable electricity generation V.18.0
Forecasted GHG Emission Reduction(TCO2/Year) 14,177
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDGs 6, 7, 8, 9, 11 and 13
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. Total installed capacity included by the GCC project is drawn as 11.450 MW. The average annual generated energy is expected to be 21,871.36 MWh according to the generation values and the project will be able to deliver a reduction in emissions of around 14,177 tCO2e (tons of carbon dioxide equivalent) per annum. The total emission reduction for the whole crediting period is calculated as 141,770 tonnes of CO2.

The project is expected to contribute 6 SDGs which are SDG 6,7,8,9,11 and 13.

Additional Information