Project Submission No. | S00551 |
---|---|
Project Title | Vyshali Wind Power project at Karnataka, India. |
Project Owner(s) (as per PSF & LOA) | Vyshali Energy Private Limited |
Submission Date | 2022-06-23 |
Global Stakeholder Consultation Period |
2022-10-26 to 2022-11-09 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022) |
Forecasted GHG Emission Reduction (tCO2e/Year) | 101,890 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Platinum |
Forecasted Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
India
|
---|---|
Focal Point of Project Owners
|
Greenko Energies Private Limited |
Email of Contact Person of FP (Primary) | muraliraju.m@greenkogroup.com |
Email of Contact Person of FP (Secondary) | seshagirirao.n@greenkogroup.com |
Name of Authorized External Representative Organization | Greenko Energies Private Limited |
Name of Focal Point of External Representative | M. Murali krishnam Raju |
Email-id of External representative | muraliraju.m@greenkogroup.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | The proposed Project Activity is a new grid-connected 50 MW wind power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The Project Activity is being implemented in state of Karnataka in India by Vyshali Energy Private Limited - 50 MW is a Special Purpose Vehicle under Greenko Energies Private Limited. Hence the state of Karnataka is considered as geographical area and the project boundary includes the spatial extent of project site where the plant has been installed, power evacuation infrastructure including the other power stations feeding to the connected electricity grid, energy metering points, switch yards and other civil constructs. The annual average net electricity generation from the project activity is estimated to be 109,500 MWh on an average over the ten-year crediting period. |
---|