PROJECT DETAILS

Project Submission No. S00617
Project Title Sandla 74MW bundled Wind Power project at Andhra Pradesh, India
Project Owner(s) (as per PSF & LOA) Sandla Wind Project Private Limited and Greenko Energies Private Limited
Submission Date 2022-06-23
Global Stakeholder Consultation Period 2022-11-21 to
2022-12-05
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022)
Forecasted GHG Emission Reduction (tCO2e/Year) 151,612
Forecasted E+ Label Yes
Verified E+ Label
Forecasted S+ Label Yes
Verified S+ Label
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Platinum
Verified SDG+ Label
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility
Location Details Open Full Map
Country
 India
Focal Point of Project Owners
Greenko Energies Private Limited
Email of Contact Person of FP (Primary) muraliraju.m@greenkogroup.com
Email of Contact Person of FP (Secondary) sheshagirirao.n@greenkogroup.com
Name of Authorized External Representative Organization Greenko Energies Private Limited
Name of Focal Point of External Representative M. Murali krishnam Raju
Email-id of External representative muraliraju.m@greenkogroup.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The proposed Project Activity is a bundled new grid-connected 74.4 MW wind power plant/unit with one bundle that consists two project activities and at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The Project Activity is being implemented in state of Andhra Pradesh in India by Poly Solar Parks Private Limited- 24 MW and Greenko Sandla Wind Project Private Limited- 50.4 MW respectively. These projects were allotted by New & Renewable Energy Development Corporation of Andhra Pradesh Ltd. (NREDCAP), which is acting as a Nodal Agency as per orders of Govt. of A.P. vide G.O.Ms.No.9 dt.13.02.2015 of Energy, Infrastructure & Investment (PR.II) Dept. accords approval for setting up of wind power projects in the State. These are old projects before process of “Bidding” has started and here the proposals were given to government nodal agencies for setting up such projects. Hence the state of Andhra Pradesh is considered as geographical area and the project boundary includes the project site where the plant has been installed, power evacuation infrastructure including the other power stations feeding to the connected electricity grid, energy metering points, switch yards and other civil constructs. Here the project uses wind energy that rotates wind turbines, the rotating turbines generate electricity. The electricity generated from Project Activity is exported to the integrated Indian grid. The electricity generated by the Project Activity thus replaces the equivalent amount of electricity generated by the operation of existing grid connected power plants; mostly fossil fuel based power plants and by addition of new fossil fuel based plants.