PROJECT DETAILS

Project Submission No. S00637
Project Title 24 MW Gullu Small Hydro Electric Project by Chhattisgarh Hydro Power LLP
Project Owner (as per PSF & LOA) Chhattisgarh Hydro Power LLP
Submission Date 23 Jun 2022
Global Stakeholder Consultation Period 28 Nov 2022 - 12 Dec 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources --- Version 21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 91,100 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Location Details Open Full Map
Country India
Focal Point of Project Owners (FP)
EKI Energy Services Limited
Email of Contact Person of FP (Primary) manish@enkingint.org
Email of Contact Person of FP (Secondary) naveen@enkingint.org
Name of Authorized External Representative Organization EKI Energy services limited
Name of Focal Point of External Representative Mr. Manish Dabkara
Email-id of External representative manish@enkingint.org
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The project involves installation of a 24 MW small hydro power projects by Chhattisgarh Hydro Power LLP (CHPLLP) in the north eastern region of the Chhattisgarh state of India. The purpose of the project is to generate electricity from renewable sources of energy to supply to the national grid of India. The project harnesses the head available in the river IB in a run-of-river hydro power development system.

Additional Information

The project displaces electricity that would otherwise have been supplied by the national grid of India which currently has an emission factor of 0.9087 tCO2e/MWh. This project generates annual average GHG emission reductions of approximately 91,100 tCO2e. In entire crediting period of 10 years, the project is estimated to generate 911,000 tCO2e.

VERIFICATION OUTCOME
Opinion

LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “24 MW Gullu Small Hydro Electric Project by Chhattisgarh Hydro Power LLP”. The verification is performed on the basis of GCC criteria project verification standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting.

The review of the final version of GCC PSF and the subsequent Remote interview / follow-up interviews has provided Applus+ Certification with sufficient evidence to determine the fulfillment of stated criteria. In our opinion, the project meets all relevant GCC project standard requirements for the GCC. The project will hence be recommended by LGAI Technological Center S.A. (Applus+ Certification) for registration with the GCC.

By displacing fossil fuel-based electricity with electricity generated from a renewable source, the project results in reductions of CO2 emissions that are real, measurable and give long-term benefits to the mitigation of climate change. Emission reductions attributable to the project are hence additional to any that would occur in the absence of the project activity. Given that the project is implemented as designed, the project is likely to achieve the estimated amount of annual emission reductions of 91,100 tCO2e per year.

The verification has been performed following the requirements of the latest version of GCC verification standard, Version 03.1, GCC Project Standard, version 03.1 and on the basis of the contractual agreement.

In detail the conclusions can be summarized as follows:

-         The project does not result in negative social, environmental and/or economic impacts.

-         The project contribution to Environment, Social Development and Economic and technological development

-         The project additionality is sufficiently justified in the GCC PSF.

-         Conservative assumptions were applied in the project description.

-         The monitoring plan of SDG parameters is transparent and adequate.

-         The project meets the local stakeholder consultation requirements.

      The conclusions of this report show, that the project, as it was described in the project documentation, is in line with all criteria applicable for the verification.

Report (Public) Verification Report (public)
Verification report date 2023-11-27
First Request for Registration Date 2023-11-27
© 2024 Global Carbon Council