Project Submission No. | S00390 |
---|---|
Project Title | Okkayası Regulator and Şehitlik Hydroelectric Power Plant |
Project Owner (as per PSF & LOA) | Okkayası Elektrik Üretim ve İnşaat A.Ş. |
Submission Date | 22 Jun 2022 |
Global Stakeholder Consultation Period | 20 Sep 2022 - 4 Oct 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Hydro Power |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
Forecasted GHG Emission Reduction (tCO2e/Year) | 32,427 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Country | Türkiye |
---|---|
Focal Point of Project Owners (FP)
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Name of Authorized External Representative Organization | Desilyon Danışmanlık Ticaret A.Ş. |
Name of Focal Point of External Representative | Özlem Özkapı |
Email-id of External representative | ozlem@desilyon.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Okkayası Elektrik Üretim ve İnşaat A.Ş. has constructed the Okkayası Regulator and Şehitlik Hydroelectric Power Plant Project. The aim of the project is to produce electrical energy to the Turkish national grid. The project includes 2 units. Each of the unit has 12.858 MWm / 12.475 MWe installed capacity. Therefore, total installed capacity of the project is 25.716 MWm / 24.950 MWe. Annual electricity production is expected to be 56,830,000 kWh according to the generation license and the emission reduction is estimated around 32,427 tCO2e annually. |
---|---|
Additional Information |
Opinion | 4K Earth Science Private Limited has been contracted by ‘Desilyon Danışmanlık Ticaret A.Ş’ to undertake verification of the project activity “Okkayası Regulator and Şehitlik Hydroelectric Power Plant. The verification was performed based on rules and requirements defined by GCC for the project activity. • The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.3 paragraph 23-25, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project |
---|---|
Report (Public) | Verification Report (public) |
Verification report date | |
First Request for Registration Date | 2023-06-26 |