PROJECT DETAILS

Project Submission No. S00860
Project Title 10 MW Solar Power Project in Telangana by SCCL
Project Owner (as per PSF & LOA) MPCON Limited
Focal Point of Project Owners*(FP)
Mpcon Limited
Email of Contact Person of FP (Primary) operationscc.mpcon@mpconsultancy.org
Email of Contact Person of FP (Secondary) operationscc.mpcon@mpconsultancy.org
Country India
Submission Date 22 Jun 2022
Global Stakeholder Consultation Period 5 Feb 2023 - 19 Feb 2023
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0
Forecasted GHG Emission Reduction(TCO2/Year) 16057
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 3,4,7,8,13
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

The proposed Project Activity is the installation of a new grid-connected 10 MW solar power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project is being implemented in Telangana state of India.

The electricity generated from Project Activity is exported to the Indian grid in India there by displacing the consumption of electricity from the regional grid electricity distribution system.

The electricity generated by the Project Activity thus replaces the equivalent amount of electricity generated by the operation of existing/ grid connected power plants (mostly fossil fuel-based power plants) and by addition of new generation sources into the grid. The Project Activity thus reduces the anthropogenic emissions of greenhouse gases (GHGs) in to the atmosphere associated with the equivalent amount of electricity generation from the existing grid connected power plants (mostly fossil fuel) and by addition of new generation sources into the grid.

The project is implemented by The Singareni Collieries Company Limited. The annual estimated emission reductions over crediting period is 16,057 tCO2e/annum
 

Additional Information

The annual estimated
emission reductions over crediting period is 16,057 tCO2e/annum