Project Submission No. | S00879 |
---|---|
Project Title | 129 MW Solar Power Project by SCCL in Telangana |
Project Owner (as per PSF & LOA) | MPCON Limited |
Focal Point of Project Owners*(FP)
|
Mpcon Limited |
Email of Contact Person of FP (Primary) | operationscc.mpcon@mpconsultancy.org |
Email of Contact Person of FP (Secondary) | operationscc.mpcon@mpconconsultancy.org |
Country | India |
Submission Date | 22 Jun 2022 |
Global Stakeholder Consultation Period | 12 Feb 2023 - 26 Feb 2023 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 199,892 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 7,8 & 13 |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The proposed Project Activity is the installation of a new grid-connected 129 MW solar power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project is being implemented in Telangana state of India.
The electricity generated from Project Activity is exported to the Indian grid in India there by displacing the consumption of electricity from the regional grid electricity distribution system.
The electricity generated by the Project Activity thus replaces the equivalent amount of electricity generated by the operation of existing/ grid connected power plants (mostly fossil fuel-based power plants) and by addition of new generation sources into the grid. The Project Activity thus reduces the anthropogenic emissions of greenhouse gases (GHGs) in to the atmosphere associated with the equivalent amount of electricity generation from the existing grid connected power plants (mostly fossil fuel) and by addition of new generation sources into the grid.
The project is implemented by The Singareni Collieries Company Limited. The annual estimated emission reductions over crediting period is 199,892 tCO2e/annum. |
---|---|
Additional Information | The annual estimated is 199,892 tCO2e/annum |