PROJECT DETAILS

Project Submission No. S00689
Project Title Aluform Bundle SPP
Project Owner(s) (as per PSF & LOA) ALUFORM PEKİNTAŞ ALÜMİNYUM SAN VE TİC A.Ş. GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DANIŞMANLIK VE TİCARET A.Ş.
Submission Date 2022-06-22
Global Stakeholder Consultation Period 2022-12-06 to
2022-12-20
Registration Date 2026-08-25
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 7,186
Verified GHG Emission Reduction (tCO2e/Year) 7,186
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Türkiye
Focal Point of Project Owners
GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S
Email of Contact Person of FP (Primary) kemal.demirkol@gte.com.tr
Email of Contact Person of FP (Secondary) hatice.ustuntas@schmid-pekintas.com
Project Verifier 4K Earth Science Private Limited
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Brief

Aluform Bundle SPP is operated by Aluform Pekintaş Alüminyum San ve Tic A.Ş which acquired 6 individual Unlicensed Photovoltaic Solar Power Plants. Those plants’ names are BHE-1, BHE-2, BHE-3, BHE-4, BHE-5 and BHE-6, and they are operated by Aluform Pekintaş Alüminyum San ve Tic A.Ş and named after it. The plants previously had been owned by BHE Enerji Müh. Müş. Elek. Üretim İnş. Taah. San. Ve Tic. Ltd. Şti. Later in 13/10/2020 the BHE Company was merged with Aluform Pekintaş Alüminyum, and the subjected plants have been taken over by the Aluform Company. The plants have a capacity of 5.994 MWe in total, which is formed according to the Law no: 6446 on Electricity Market Law. The project is reducing national energy deficit and development of local industries as it allows the use of local sources for energy generation to meet the increasing demands.

The project activity will remove GHG emissions by avoiding CO2 emissions from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. The average annual generated energy of 11,077.27MWh will be able to deliver a reduction in emissions of around 7,186 tCO2e (tons of carbon dioxide equivalent) per annum and 71,860 tonnes of CO2 for the whole 10-year crediting period.

 

VERIFICATION OUTCOME
Report (Public) Verification Report (public)
Verification report date 2026-06-06
First Request for Registration Date 2023-12-05
Opinion

4K Earth Science Private Limited has been contracted by ‘Aluform Pekintaş Alüminyum San Ve Tic A.Ş.’ to undertake verification of the project activity “Aluform Bundle SPP” in Türkiye. The verification was performed based on rules and requirements defined by GCC for the project activity.

The project involves installation of 06 individual Unlicensed Solar Power Plants with a total capacity of 5.994 MWe/ 7.154 MWp. The project activity is implemented in Gögerli Village, Viranşehir District, Şanlıurfa Province in Türkiye.

The aim of the project activity is to generate electricity from the renewable source (Solar power plant). The electricity generated from project activity is exported to the Turkish national grid through system usage agreements/57/, there by displacing electricity from the regional grid which would have otherwise been generated by the operation of grid connected power plants and by the addition of new generation sources into the grid. This bundled project activity consists of solar panels and associated connection boxes, Inverters, other field equipment. Thus, the project activity generates an average of 11,077.27 MWh/year/8/ electricity and displacing 7,186 tCO2e/year/8/.

 

The project aims to generate electricity by using solar power to supply the increasing national electricity demand in a cleaner and sustainable manner. It reduces the air pollution caused by the grid connected power plants which are mostly fossil fuel fired. The project is expected to contribute 3 SDGs which are SDG 7, 8 and 13.

The project correctly applies the approved baseline and monitoring AMS I.D. “Grid connected renewable electricity generation”, version 18.0/09/ and is assessed against latest valid PS, VS and Environment and Social Safeguards Standard/04/, Project-Sustainability-Standard/05/ and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms. 

The project activity is likely to achieve the anticipated emission reductions stated in the PSF/27/ provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 7,186 tCO2e/year over the 10 years crediting period starting from 04/01/2019.

4K Earth Science Private Limited has verified and hereby certifies that the GCC Project Activity “Aluform Bundle SPP”:

·        has correctly described the Project Activity in the Project Submission Form (version 09, dated 06/04/2025) including the applicability of the approved methodology AMS I.D. “Grid connected renewable electricity generation”, version 18.0/09/ and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

·        is likely to generate GHG emission reductions amounting to the estimated 71,860 tCO2eq over the fixed crediting period of ten years, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity  

·        is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard/04/, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and

·        is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard/05/, and contribute to achieving a total of 03 SDGs, which is likely to achieve the Silver SDG certification label (SDG+).

·        The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.3 paragraph 23-25/23/, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project

is likely to contribute to CORSIA Eligible Emission Units and has CORSIA Label (C+) certification valid till 31 December 2020. A written attestation from the Host country on double counting is not required until 31 December 2020 and the project was found meeting the applicable requirements prescribed by ICAO.
 

© 2026 Global Carbon Council