Project Submission No. | S00728 |
---|---|
Project Title | Baishitoukouzi Cascade Hydropower Project |
Project Owner (as per PSF & LOA) | ASIA CARBON ASSET LIMITED |
Focal Point of Project Owners*(FP)
|
Asia Carbon Asset Limited |
Email of Contact Person of FP (Primary) | aca-michelle@hotmail.com |
Email of Contact Person of FP (Secondary) | qinxizhang@hotmail.com |
Country | China |
Submission Date | 22 Jun 2022 |
Global Stakeholder Consultation Period | 14 Dec 2022 - 28 Dec 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002, Version 20.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 81,891 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | SDG #7, #8, #9 |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The Baishitoukouz Cascade Hydropower Project, which was developled and constructed by Sunan Yugur Autonomous County Longyang Hydropower Co., Ltd, is a cascade hydropower project consisting of three cascade hydropower plants.The installed capacity of the three cacscade hydropower plants is 17.6MW, 6MW and 3.4MW respectively, which gives 27MW of installed capacity in total. The aim of the project is to utilize renewable resources to generate and supply electricity to the Northwest ChinaPowerGrid (NWCPG). The electricity supplied to the grid by the Project is estimated to be 122,888 MWh and will achieve 81,891 tCO2 of emission reductios annualy. The emisson reductions which will be ahieved by the Project over its 10-year crediting period is estimated to be 818,910 tCO2. The Project situated in Zhulongguan village, QifengTownship, SunanYugur Autonomous County, Zhangye City, Gansu Province, China. The Project started its construction on 16/12/2015 and began its commissioning on 06/11/2020. |
---|---|
Additional Information |