PROJECT DETAILS

Project Submission No. S00424
Project Title Solar Power Project by ES Sun Power
Project Owner (as per PSF & LOA) ES Sun Power Private Limited
Focal Point of Project Owners*(FP)
Emergent Ventures India Pvt. Ltd.
Email of Contact Person of FP (Primary) atul.sanghal@emergent-ventures.com
Email of Contact Person of FP (Secondary) jatin@emergent-ventures.com
Country India
Submission Date 20 Jun 2022
Global Stakeholder Consultation Period 26 Sep 2022 - 10 Oct 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources ; Version 20.0
Forecasted GHG Emission Reduction(TCO2/Year) 33,176
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7,8,13
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization Emergent Ventures India Pvt. Ltd.
Name of Focal Point of External Representative Atul Sanghal
Email-id of Focal Point atul.sanghal@emergent-ventures.com
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

The purpose of project activity is to generate and feed to the connected national electricity grid of India GHG free electricity by the installation of solar power plant having a capacity of 20MWac. The proposed solar power project is located at Begepalli Taluk, Chikballapur District, in the state of Karnataka, in India. 

The project boundary includes the project site where the plant has been installed, power evacuation infrastructure including the other power stations feeding to the connected electricity grid, energy metering points, switch yards and other civil constructs.

The baseline of the project activity is continued generation of electricity in the national grid of India.  The electricity generation in India is highly carbon intensive. According to the latest data from Central Electricity Authority[1] on carbon intensity of grid electricity, the combined margin emission factor of the grid electricity is 0.9305tCO2e/MWh and therefore electricity generation from solar power project as in the project activity results into emission reductions. It is estimated that the project activity will effect a cumulative GHG emission reduction of 331,764 tCO2e over 10 year period of project activity with an average of 33,176 tCO2e GHG emission reduction per year and an average of 35,654 MWh electricity generation per year.


[1] https://cea.nic.in/cdm-co2-baseline-database/?lang=en

Additional Information