Project Submission No. | S00904 |
---|---|
Project Title | Kavak Beypazarı Bey Solar Power Plant Bundle |
Project Owner (as per PSF & LOA) | 1. İşmen Gıda Sanayi ve Ticaret Ltd. Şti. 2. Gaia Climate Finansal Danışmanlık Hiz. ve Tic. A.Ş. (Focal Point) |
Focal Point of Project Owners*(FP)
|
Gaia Climate Finansal Danışmanlık Hiz. ve Tic. A.Ş. |
Email of Contact Person of FP (Primary) | gkaya@gaiaclimate.com |
Email of Contact Person of FP (Secondary) | furkanartik@gaiaclimate.com |
Country | Türkiye |
Submission Date | 17 Jun 2022 |
Global Stakeholder Consultation Period | 28 Feb 2023 - 14 Mar 2023 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | AMS-I D Small Scale Methodology: Grid connected renewable electricity generation V.18 |
Forecasted GHG Emission Reduction(TCO2/Year) | 14,195 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | SDGs 6, 7, 8, 11, 13 |
Forecasted SDG+ Label | Platinum |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Kavak Beypazarı Bey Solar Power Plant Bundle Project consists of 12 individual Unlicensed Photovoltaic Solar Power Plants with a capacity of 13.04 MWp in total. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. Total installed capacity included by the GCC project is drawn as 13.04 MWp. The average annual generated energy is expected to be 22,846.08 MWh according to the generation values and the project will be able to deliver a reduction in emissions of around 14,195 tCO2e (tons of carbon dioxide equivalent) per annum. The total emission reduction for the whole crediting period is calculated as 141,950 tonnes of CO2. The project is expected to contribute 5 SDGs which are SDG 6, 7, 8, 11 and 13. |
---|---|
Additional Information |