PROJECT DETAILS

Project Submission No. S00647
Project Title Kubilay Geothermal Power Plant Project
Project Owner(s) (as per PSF & LOA) 1. Beştepeler Enerji Üretim Tic. A.Ş. ; 2. CRP Energy LTD (focal point to act on behalf of the Project Owner)
Submission Date 2022-06-17
Global Stakeholder Consultation Period 2022-11-28 to
2022-12-12
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Geothermal
GCC/CDM Methodology & Version ACM0002 – Grid-connected electricity generation from renewable sources, version 20.0
Forecasted GHG Emission Reduction (tCO2e/Year) 99,936
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Türkiye
Focal Point of Project Owners
CRP ENERGY LTD.
Email of Contact Person of FP (Primary) serhat@crpenergy.co
Email of Contact Person of FP (Secondary) muhammed.ugur@crpenergy.co
Name of Authorized External Representative Organization CRP Energy LTD.
Name of Focal Point of External Representative Serhat Kısakurek
Email-id of External representative serhat@crpenergy.co
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Kubilay Geothermal Power Plant developed by Beştepeler Enerji Üretim Tic. A.Ş. is a grid-connected large-scale geothermal power plant. The total installed capacity of the project is The total installed capacity of the project is  24WMe with a predicted electricity supply to the grid of 180 GWh and annual estimated emission reductions of  99,936 tCO2e. The total emission reductions over the 10-year crediting period are estimated to be 999,360 tCO2e. The plant has been started operation on 01.01.2017.