PROJECT DETAILS

Project Submission No. S00340
Project Title Wind Power Project Activity in MP, India
Project Owner (as per PSF & LOA) Roha Dyechem Private Limited, Arkas Energy LLP
Submission Date 17 Jun 2022
Global Stakeholder Consultation Period 8 Sep 2022 - 22 Sep 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 14,925 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility CORSIA(C+)
Location Details Open Full Map
Country India
Focal Point of Project Owners (FP)
Positive Climate Care Private Limited
Email of Contact Person of FP (Primary) meenakshi@positiveclimatecare.com
Email of Contact Person of FP (Secondary) rohagccprojects@rohagroup.com
Name of Authorized External Representative Organization Positive Climate Care Private Limited
Name of Focal Point of External Representative Meenakshi Jain
Email-id of External representative meenakshi@positiveclimatecare.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The project activity is an installation of grid connected Renewable power plant to generate clean electricity utilizing Wind energy. The project is located at Mandsaur district of Madhya Pradesh, India.

The project activity will replace anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 14916 tCO2e per annum, thereon displacing an average 16031 MWh/year amount of electricity from the generation-mix of power plants connected to the Indian electricity grid, which is mainly dominated by thermal/ fossil fuel-based power plant.

Additional Information
VERIFICATION OUTCOME
Opinion

CCIPL was contracted by Roha Dyechem Private Limited for project verification of the project activity “Wind Power Project Activity in MP, India”. The project verification was performed based on rules and requirements defined by GCC for the project activity. The project activity is a grouped Wind power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring AMS-1.D, Version 18.0 and is assessed against latest valid PS, VS and Environment and Social Safeguards Standard, Project-Sustainability-Standard and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms. The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 14,925 tCO2e/year over the 10 years crediting period starting from 01/08/2016. CCIPL has informed the project owners of the project verification outcome through the draft project verification report and final project verification report. The final project verification report contains the information with regard to fulfilment of the requirements for project verification, as appropriate.

Report (Public) Verification Report (public)
Verification report date 2023-09-07