PROJECT DETAILS

Project Submission No. S00487
Project Title Hacı Bey Wind Power Plant
Project Owner (as per PSF & LOA) Bali Rüzgar Elektrik Üretim Sanayi ve Ticaret A.Ş. and Kıvanç Enerji Üretim A.Ş.
Focal Point of Project Owners*(FP)
Kıvanç Enerji Üretim A.Ş.
Email of Contact Person of FP (Primary) mehmet@kivanc.com
Email of Contact Person of FP (Secondary) mustafa.erdemir@kivanc.com
Country Türkiye
Submission Date 17 Jun 2022
Global Stakeholder Consultation Period 6 Oct 2022 - 20 Oct 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources– Version 20.0
Forecasted GHG Emission Reduction(TCO2/Year) 121,208
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 4, 5, 7, 8, 9, 13
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point mehmet@kivanc.com
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Hacı Bey Wind Power Project has been developed by Bali Rüzgar Elektrik Üretim Sanayi ve Ticaret A.Ş. The purpose of the project is to help Turkey to stimulate and commercialize the use of grid connected renewable energy technologies and markets.Total installed capacity is 52.5 MWe / 68.8 MWm with 13 turbines. The average annual generated energy is expected to be 187,000 MWh per year connected to Turkish grid, which is mainly dominated by thermal/fossil fuel-based power plant. Over the first 10-year crediting period, the project will replace anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 1,212,080 tCO2e.

Additional Information