PROJECT DETAILS

Project Submission No. S00480
Project Title 60 MW Wind Power Project
Project Owner (as per PSF & LOA) Green Infra Wind Energy Limited
Submission Date 17 Jun 2022
Global Stakeholder Consultation Period 6 Oct 2022 - 20 Oct 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002,Version 21
Forecasted GHG Emission Reduction (tCO2e/Year) 96,676 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Location Details Open Full Map
Country India
Focal Point of Project Owners (FP)
Green Infra Wind Energy Limited (GIWEL)
Email of Contact Person of FP (Primary) gangesh.tiwari@sembcorp.com
Email of Contact Person of FP (Secondary) shivanjali.mishra@sembcorp.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The project activity is the installation of a new grid-connected 60 MW Wind Turbine plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project activity is wind power project which is being implemented in Madya Pradesh of India by Green Infra Wind Energy Limited. The electricity generated from Project Activity is exported to the Indian grid there by displacing the consumption of electricity from the regional grid electricity distribution system.

 The estimated annual average electricity generation by the project activity is 1,03,876 MWh. The crediting period chosen for the project activity “60 MW Wind Power Project” is 10 years Crediting Period in which total GHG emission reduction estimated is 9,67,109 tCO2e.The annual average estimated emission reductions from project activity is 96,710 tCO2e/annum.

Additional Information
VERIFICATION OUTCOME
Opinion

4K Earth Science Private Limited has been contracted by ‘Infinite Environmental Solutions LLP’ to undertake verification of the project activity “60 MW Wind Power Project” in India. The verification was performed based on rules and requirements defined by GCC for the project activity.
The project involves installation of 60MW (1.5MW x 40)) Wind Turbines by Green Infra Wind Energy Limited. The electricity generated from project activity is exported to the Indian grid in India through power purchase agreement with, MPPMCL (Madhya Pradesh Power Management Company Limited there by displacing electricity from the Indian grid generated by fossil fuel-based power plants. This project activity consists of Tooth belt rotor, transformers and other field equipment. Thus, the project activity is estimated to generate an average of 103,876 MWh/year electricity and displacing 96,676 tCO2e/year. In the baseline scenario the equivalent amount of electricity delivered to the grid by the project activity would have otherwise been generated by the operation of grid connected power plants and by the addition of new generation sources into the grid. The main emission source in the baseline scenario is the power plants connected to the grid and main greenhouse gas involved is CO2.
4K Earth Science Private Limited has verified and hereby certifies that the GCC Project Activity “60 MW Wind Power Project”:


• has correctly described the Project Activity in the Project Submission Form (version 6, dated 26/03/2024) including the applicability of the approved methodology ACM0002, version 21.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;


• is likely to generate GHG emission reductions amounting to the estimated 966,760 tCO2eq over the fixed crediting period of ten years, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity


• is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and


• is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+).

• The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.3 paragraph 23-25, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project


• is likely to contribute to CORSIA Eligible Emission Units and has CORSIA Label (C+) certification valid till 31 December 2020. A written attestation from the Host country on double counting is not required until 31 December 2020 and the project was found meeting the applicable requirements prescribed by ICAO.

Report (Public) Verification Report (public)
Verification report date 2024-03-28
First Request for Registration Date 2023-10-05