PROJECT DETAILS

Project Submission No. S00367
Project Title Jinchang Xipo 100MW solar power project
Project Owner (as per PSF & LOA) Gansu ruicarbon Technology Consulting Co., Ltd
Submission Date 13 Jun 2022
Global Stakeholder Consultation Period 14 Sep 2022 - 28 Sep 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 21.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 122,282 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Location Details Open Full Map
Country China
Focal Point of Project Owners (FP)
Gansu ruicarbon Technology Consulting Co., Ltd
Email of Contact Person of FP (Primary) gansuruicarbon@163.com
Email of Contact Person of FP (Secondary) rui_carbon@163.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

 Jinchang Xipo 100MW solar power project (hereafter referred to as “the project”) is a newly built solar power project, located in Xipo photoelectric Industrial Park, Jinchang city, Gansu province, China. The project involves installation and operation of 314,655 solar modules, consisting a total actual  capacity of 99.8814 MW. The project is invested and developed by Jinchang Zhenxin Xipo Solar Power Co., Ltd

The purpose of the project is to generate clean energy by utilizing solar power and providing the energy to the Northwest China Power Grid (hereafter refer as NWCPG).The project is estimated operating 25 years and average annual electricity fed to NWCPG during whole life time is estimated to be 148,927 MWh. During GCC crediting period, average annual electricity fed to NWCPG is  estimated to be 156,908 MWh. Annual average GHG emission reduction is 122,282 tCO2e during the fixed crediting period.

The project is expected to contribute to 4 SDGs which are SDG 7, 8 and 13. 

Additional Information
VERIFICATION OUTCOME
Opinion

The GCC Project Verifier [Shenzhen CTI International Certification Co., Ltd (CTI)], shall verify and certify that the GCC Project Activity [Jinchang Xipo 100MW solar power project]:

(a) has correctly described the Project Activity in the Project Submission Form (version 2.0, dated 21/03/2023) including the applicability of the approved methodology [ACM0002: “Grid-connected electricity generation from renewable sources” (Version 21.0)] and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

(b) is likely to generate GHG emission reductions amounting to the estimated [1,222,820] tCO2eq, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity;

(c) is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net harm Label (S+); and

(d) is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of [3] SDGs (SDG 7, 8, 13), which is likely to achieve the [Silver] SDG certification label (SDG+).

 

Report (Public) Verification Report (public)
Verification report date 2024-04-03
First Request for Registration Date 2023-09-13