Project Submission No. | S00367 |
---|---|
Project Title | Jinchang Xipo 100MW solar power project |
Project Owner (as per PSF & LOA) | Gansu ruicarbon Technology Consulting Co., Ltd |
Focal Point of Project Owners*(FP)
|
Gansu ruicarbon Technology Consulting Co., Ltd |
Email of Contact Person of FP (Primary) | gansuruicarbon@163.com |
Email of Contact Person of FP (Secondary) | rui_carbon@163.com |
Country | China |
Submission Date | 13 Jun 2022 |
Global Stakeholder Consultation Period | 14 Sep 2022 - 28 Sep 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
Forecasted GHG Emission Reduction(TCO2/Year) | 122,282 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | SDG 7, 8 |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Jinchang Xipo 100MW solar power project (hereafter referred to as “the project”) is a newly built solar power project, located in Xipo photoelectric Industrial Park, Jinchang city, Gansu province, China. The project involves installation and operation of 314,655 solar modules, consisting a total actual capacity of 99.8814 MW. The project is invested and developed by Jinchang Zhenxin Xipo Solar Power Co., Ltd The purpose of the project is to generate clean energy by utilizing solar power and providing the energy to the Northwest China Power Grid (hereafter refer as NWCPG).The project is estimated operating 25 years and average annual electricity fed to NWCPG during whole life time is estimated to be 148,927 MWh. During GCC crediting period, average annual electricity fed to NWCPG is estimated to be 156,908 MWh. Annual average GHG emission reduction is 122,282 tCO2e during the fixed crediting period. The project is expected to contribute to 4 SDGs which are SDG 7, 8 and 13. |
---|---|
Additional Information |