PROJECT DETAILS

Project Submission No. S00335
Project Title Solar Project by Eden Renewable CITE Private Limited
Project Owner (as per PSF & LOA) Eden Renewable CITE Private Limited
Focal Point of Project Owners*(FP)
Eden Renewable Cite Private Limited
Email of Contact Person of FP (Primary) cc.seci3@eden-re.com
Email of Contact Person of FP (Secondary) cc.seci3@eden-re.com
Country India
Submission Date 13 Jun 2022
Global Stakeholder Consultation Period 7 Sep 2022 - 21 Sep 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0.
Forecasted GHG Emission Reduction(TCO2/Year) 729,398
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 4,7,8 and 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization EKI Energy services limited
Name of Focal Point of External Representative Mr. Manish Dabkara
Email-id of Focal Point manish@enkingint.org
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

The proposed project activity is the installation of a new grid-connected 300 MWAC Solar power plant/unit at the site where no renewable power plant was operating prior to the implementation of the project activity (It is a greenfield plant13). The project activity is solar power project, which is implemented in, Village Lakhasar, Tehsil Pokhran, District Jaisalmer, Rajasthan by Eden Renewable CITE Private Limited.

The electricity generated from project activity (operational solar power plant) is connected to the Indian grid. The project activity thus reduces the anthropogenic emissions of greenhouse gases (GHGs) associated with equivalent amount of electricity generation from the existing grid connected power plants (mostly fossil fuel based) and from addition of new generation sources into the grid.

As the project activity complies to the definition of a Greenfield power plant, therefore the baseline scenario as per paragraph 22 of Section 5.2.1 of applied methodology is “electricity delivered to the grid by the project activity would have otherwise been generated by the operation of grid-connected power plants and by the addition of new generation sources”, as described in the combined margin (CM) calculations described in “TOOL07: Tool to calculate the emission factor for an electricity system”.

Additional Information

The annual emission calculation for this project activity is 729,398 TCO2e.