PROJECT DETAILS

Project Submission No. S00755
Project Title Bundled Solar Energy Project in Gujarat, Rajasthan and Uttar Pradesh
Project Owner(s) (as per PSF & LOA) Adani Solar Energy Four Private Limited; Adani Solar Energy Kutchh Two Private Limited; Adani Solar Energy Kutchh One Limited; Adani Solar Energy Chitrakoot One Limited; Adani Green Energy Limited
Submission Date 2022-06-13
Global Stakeholder Consultation Period 2022-12-22 to
2023-01-05
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002 Grid-connected electricity generation from renewable sources - Version 21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 883,908
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 India
Focal Point of Project Owners
Adani Green Energy Limited
Email of Contact Person of FP (Primary) emission.reductions@adani.com
Email of Contact Person of FP (Secondary) sandip.saha@adani.com
Email-id of External representative emission.reductions@adani.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The project activity involves installations of bundled solar projects in Gujarat, Rajasthan and Uttar Pradesh in India. The project activity comprises of seven solar projects. Thus, total capacity of this bundle is 475 MW.  The electricity generated from Project Activity is exported to the Indian grid there by displacing the grid electricity which is dominated by fossil fuel based power plants.

The estimated annual average electricity generation by the project activity is 948,448MWh per Annum after considering degradation factor for the entire crediting period.

The crediting period chosen for the project activity “Adani Green Energy Limited” is 10 years Crediting Period in which the total GHG emission reduction estimated is around  8,839,087 tCO2. The annual average estimated emission reductions from project activity is  883,908  tCO2/Annum.