PROJECT DETAILS

Project Submission No. S00381
Project Title Jinchang Xipo 25MW solar power project
Project Owner(s) (as per PSF & LOA) Gansu ruicarbon Technology Consulting Co., Ltd
Submission Date 2022-06-13
Global Stakeholder Consultation Period 2022-09-15 to
2022-09-29
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources (Version 21.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 30,539
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 China
Focal Point of Project Owners
Gansu ruicarbon Technology Consulting Co., Ltd
Email of Contact Person of FP (Primary) gansuruicarbon@163.com
Email of Contact Person of FP (Secondary) gansuruicarbon@163.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Jinchang Xipo 25MW solar power project (hereafter referred to as “the project”) is a solar photovoltaic power generation project with installed capacity of 25MWp consisting by 71926 PV modules. It is located in Xipo photoelectric Industrial Park, about 18km away from Jinchang city, Gansu province, China. The project is invested and developed by Jinchang Zhenxin Xipo Solar Power Co., Ltd. 

The purpose of the project is to generate clean energy by using the solar power and providing the energy to the Northwest China Power Grid (hereafter refer as NWCPG). The project is estimated operating 25 years and average annual electricity fed to NWCPG during whole life time is estimated to be 36,932 MWh. During GCC crediting period, average annual electricity fed to NWCPG is  estimated to be 39,188 MWh while the average annual GHG emission reduction is 30,539 tCO2e during the fixed crediting period. 

The project is expected to contribute to 4 SDGs which are SDG 7, 8 and 13. 