PROJECT DETAILS

Project Submission No. S00332
Project Title Gaziosmanpaşa Wind Power Plant
Project Owner (as per PSF & LOA) 1. Resistanbul Enerji Anonim Şirketi 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Türkiye
Submission Date 10 Jun 2022
Global Stakeholder Consultation Period 7 Sep 2022 - 21 Sep 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 129,640
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 11, SDG 13
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Resistanbul Enerji Anonim Şirketi has constructed the Gaziosmanpaşa Wind Power Plant Project. Regarding this, Resistanbul Enerji Anonim Şirketi constructed a wind power plant in İstanbul district, Silivri province, Turkey. The total installed capacity is 54 MWm/50 Mwe. The average annual generated energy is expected to be 200,000 MWh and the project will be able to deliver a reduction in emissions of around 129,640 tCO2e (tons of carbon dioxide equivalent) annually. For the entire crediting period, 1,296,400 tonnes of CO2 are expected to be reduced.

Additional Information