PROJECT DETAILS

Project Submission No. S00332
Project Title Gaziosmanpaşa Wind Power Plant
Project Owner(s) (as per PSF & LOA) 1. Resistanbul Enerji Anonim Şirketi 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Submission Date 2022-06-10
Global Stakeholder Consultation Period 2022-09-07 to
2022-09-21
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 110,282
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Türkiye
Focal Point of Project Owners
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Resistanbul Enerji Anonim Şirketi has constructed the Gaziosmanpaşa Wind Power Plant Project. Regarding this, Resistanbul Enerji Anonim Şirketi constructed a wind power plant in İstanbul district, Silivri province, Turkey. The total installed capacity is 54 MWm/50 Mwe. The average annual generated energy is 169,979 MWh and the project will be able to deliver a reduction in emissions of around 110,282 tCO2e annually. For the entire crediting period, 1,102,824 tonnes of CO2 are expected to be reduced.