Project Submission No. | S00332 |
---|---|
Project Title | Gaziosmanpaşa Wind Power Plant |
Project Owner (as per PSF & LOA) | 1. Resistanbul Enerji Anonim Şirketi 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners) |
Focal Point of Project Owners*(FP)
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Country | Türkiye |
Submission Date | 10 Jun 2022 |
Global Stakeholder Consultation Period | 7 Sep 2022 - 21 Sep 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
Forecasted GHG Emission Reduction(TCO2/Year) | 129,640 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Forecasted SDG+ Label | Platinum |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Resistanbul Enerji Anonim Şirketi has constructed the Gaziosmanpaşa Wind Power Plant Project. Regarding this, Resistanbul Enerji Anonim Şirketi constructed a wind power plant in İstanbul district, Silivri province, Turkey. The total installed capacity is 54 MWm/50 Mwe. The average annual generated energy is expected to be 200,000 MWh and the project will be able to deliver a reduction in emissions of around 129,640 tCO2e (tons of carbon dioxide equivalent) annually. For the entire crediting period, 1,296,400 tonnes of CO2 are expected to be reduced. |
---|---|
Additional Information |