Project Submission No. | S00332 |
---|---|
Project Title | Gaziosmanpaşa Wind Power Plant |
Project Owner(s) (as per PSF & LOA) | 1. Resistanbul Enerji Anonim Şirketi 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners) |
Submission Date | 2022-06-10 |
Global Stakeholder Consultation Period |
2022-09-07 to 2022-09-21 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() ![]() ![]() |
Forecasted SDG+ Label | Platinum |
Forecasted Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Resistanbul Enerji Anonim Şirketi has constructed the Gaziosmanpaşa Wind Power Plant Project. Regarding this, Resistanbul Enerji Anonim Şirketi constructed a wind power plant in İstanbul district, Silivri province, Turkey. The total installed capacity is 54 MWm/50 Mwe. The average annual generated energy is 169,979 MWh and the project will be able to deliver a reduction in emissions of around 110,282 tCO2e annually. For the entire crediting period, 1,102,824 tonnes of CO2 are expected to be reduced. |
---|