PROJECT DETAILS

Project Submission No. S00334
Project Title Küçükköy Solar Power Plant
Project Owner (as per PSF & LOA) 1. Antges Enerji Üretim Anonim Şirketi 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Türkiye
Submission Date 10 Jun 2022
Global Stakeholder Consultation Period 7 Sep 2022 - 21 Sep 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version CDM approved consolidated Methodology ACM0002 (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 31,409
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 6,SDG 7,SDG 8,SDG 9,SDG 11,SDG 13
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Küçükköy Solar Power Plant is a licensed solar power plant facility with a capacity of 31.15 MWm / 18.61 MWe in total. Solar panels, inverters, and power transmission lines were intended to be built in Antalya province, Korkuteli district in Turkey. The total installed capacity is 18.610 MWe. The total annual generated energy is 48,456 MWh and the project will be able to deliver a reduction in emissions of around 31,409 tCO2e (tons of carbon dioxide equivalent) per annual. For the entire crediting period, 314,092 tonnes of CO2 are expected to be reduced.

Additional Information