PROJECT DETAILS

Project Submission No. S00841
Project Title 200 MW (4 x 50 MW) Solar PV Project in Anantapur District (AP), India
Project Owner (as per PSF & LOA) NTPC Limited
Focal Point of Project Owners*(FP)
Infinite Environmental Solutions LLP
Email of Contact Person of FP (Primary) jimmy@infisolutions.org
Email of Contact Person of FP (Secondary) nspsingh@ntpc.co.in
Country India
Submission Date 10 Jun 2022
Global Stakeholder Consultation Period 24 Jan 2023 - 7 Feb 2023
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002 “Grid-connected electricity generation from renewable sources”, Version – 20.0
Forecasted GHG Emission Reduction(TCO2/Year) 282,610
Verified GHG Emission Reduction(TCO2/Year)
Forecasted E+ Label Yes
Verified E+ Label
Forecasted S+ Label Yes
Verified S+ Label
Forecasted SDG+ Goals SDG-7, SDG-8
Verified SDG+ Goals
Forecasted SDG+ Label Gold
Verified SDG+ Label
Forecasted Market Eligibility CORSIA(C+)
Verified Market Eligibility N/A
Name of Authorized External Representative Organization Infinite Solutions
Name of Focal Point of External Representative Jimmy Sah
Email-id of Focal Point jimmy@infisolutions.org
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

The proposed project activity is the installation of 200 MW (4 x 50 MW)) solar photovoltaic power plant/unit with the purpose of generation of clean electricity and contributing to achieve the requirements of the Green Economy Strategy of the country by harnessing the renewable “Solar Energy”. NTPC Limited commissioned a solar project in 2016 with capacity of 250 MW (5 x 50 MW). In the said capacity, 200 MW (4 x 50 MW) was commissioned on 30/04/2016 and the remaining 50 MW (1 x 50 MW) was commissioned on 31/07/2016.

Additional Information

NTPC Limited commissioned a solar project in 2016 with capacity of 250 MW (5 x 50 MW). In the said capacity, 200 MW (4 x 50 MW) was commissioned on 30/04/2016 and the remaining 50 MW (1 x 50 MW) was commissioned on 31/07/2016. However, the 50 MW (1 x 50 MW) project commissioned on 31/07/2016 was already registered in Verra and now NTPC Limited is registering the remaining 200 MW (4 x 50 MW) in GCC. The project is being implemented in Anantapur District of Andhra Pradesh in India by NTPC Limited.