PROJECT DETAILS

Project Submission No. S00074
Project Title Gümüşören Dam and Hydro Power Plant
Project Owner (as per PSF & LOA) 1. Bükor Enerji Üretim A.Ş. & 2. Desilyon Danışmanlık Ticaret A.Ş. (focal point to act on behalf of all Project Owners)
Submission Date 10 Nov 2021
Global Stakeholder Consultation Period 16 Jan 2022 - 30 Jan 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 6,430 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Country Türkiye
Focal Point of Project Owners (FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Bükor Elektrik Üretim A.Ş. has constructed the Gümüşören Dam and Hydro Power Plant Project. Bükor Elektrik Üretim A.Ş. constructed a hydropower plant in Develi district, Kayseri province, Turkey. The project includes 3 units. Two of them have 4.64 MWm/ 4.594 MWe installed capacity. The other one has 0.410 MWm/ 0.406 MWe installed capacity. Annual electricity production is expected to be 11,900,000 kWh according to the generation license. The generation license is signed on 19/04/2018. The average annual generated electricity is expected to be 11,900,000 kWh according to the generation license and the emission reduction is estimated around 6,430 tCO2e per annum.

Additional Information
VERIFICATION OUTCOME
Opinion

CCIPL was contracted by Desilyon Danışmanlık Ticaret A.Ş for project verification of the project activity “Gümüşören Dam and Hydro Power Plant” in Turkey. The project verification was performed based on rules and requirements defined by GCC for the project activity.
The project activity is a hydro power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring AMS.I.D version 18.0 and is assessed against latest valid PS, VS and Environment and Social Safeguards Standard, Project-Sustainability-Standard and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms.
The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 6,727 tCO2e/year over the 10 years crediting period starting from 01/09/2018.
CCIPL has informed the project owners of the project verification outcome through the draft project verification report and final project verification report. The final project verification report contains the information with regard to fulfilment of the requirements for project verification, as appropriate.
CCIPL applied the following verification process and methodology using a competent verification team;
• the desk review of documents and evidence submitted by the project owner in context of the reference GCC rules and guidelines issued,
• undertaking/conducting site visit, interview, or interactions with the representative of the project owner,
• reporting audit findings with respect to clarifications and non-conformities and the closure of the findings, as appropriate
• preparing a draft verification opinion based on the auditing findings and conclusions
• technical review of the draft project verification opinion along with other documents as appropriate by an independent competent technical review team
• finalization of the project verification opinion (this report)
Carbon Check (India) Private Limited (CCIPL) has verified and hereby certifies that the GCC project activity “Gümüşören Dam and Hydro Power Plant”

Report (Public) Verification Report (public)
Verification report date
First Request for Registration Date 2022-07-01