Project Submission No. | S00074 |
---|---|
Project Title | Gümüşören Dam and Hydro Power Plant |
Project Owner(s) (as per PSF & LOA) | 1. Bükor Enerji Üretim A.Ş. & 2. Desilyon Danışmanlık Ticaret A.Ş. (focal point to act on behalf of all Project Owners) |
Submission Date | 2021-11-10 |
Global Stakeholder Consultation Period |
2022-01-16 to 2022-01-30 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Hydro Power |
GCC/CDM Methodology & Version | AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 6,729 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Gümüşören Dam and Hydro Power Plant Project has been constructed by Bükor Elektrik Üretim A.Ş. which is the legal project owner of the plant6. The project aims to contribute to reducing national energy deficit and development of local industries as it allows the use of cheaper energy for industrialists and gain advantage in a competitive environment. By means of reducing dependency to the fossil fuels, environmental pollution is significantly reduced. Also, clean energy is generated by using hydro power. Regarding to this, a hydropower plant has been constructed by Bükor Elektrik Üretim A.Ş. in Develi district, Kayseri province, Türkiye. Based on the applied tool, the project boundary is considered as the National Electricity Grid of Türkiye. The energy generation from the fossil fuels is referred to the baseline scenario. |
---|