PROJECT DETAILS

Project Submission No. S00467
Project Title 200 MW Solar Project in Tamilnadu
Project Owner(s) (as per PSF & LOA) Narbheram Power and Steel Private Limited
Submission Date 2022-06-08
Global Stakeholder Consultation Period 2022-10-05 to
2022-10-19
Registration Date 2026-07-20
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources (Version 21.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 308,086
Verified GHG Emission Reduction (tCO2e/Year) 308,086
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 India
Focal Point of Project Owners
Narbheram Power and Steel Private Ltd
Email of Contact Person of FP (Primary) binay.goenka@athagroup.in
Email of Contact Person of FP (Secondary) gaurav.bhattacharjee@athagroup.in
Name of Authorized External Representative Organization Narbheram Power and Steel Private Limited
Name of Focal Point of External Representative Mr. Binay Goenka
Email-id of External representative binay.goenka@athagroup.in
Project Verifier LGAI TECHNOLOGICAL CENTER, S.A.
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Brief

The project activity involves the installation of new grid-connected Solar Power Projects in Thoothukudi, Tamil Nadu State of India at sites where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project has developed by two SPV Narbheram Solar TN Private Limited and NVR Energy Private Limited part of group Atha Group. The electricity generated from Project Activity is exported to the Indian grid there by displacing the consumption of electricity from the regional grid electricity distribution system. The total installed capacity of the proposed project activity is 200 MW, which involves operation of two solar projects of 100 MW each in Tamil Nadu.

Additional Information

The crediting period chosen for the project activity “200 MW Solar Project in Tamil Nadu” is 10 years crediting period. The annual average estimated emission reductions from project activity are 308,086 tCO2e/annum. Over the entire crediting period of 10 years the project will reduce 3,080,860 tCO2e, thereon displacing average 330,919.43 MWh/year and a total of 3,309,194.30 MWh amount of electricity from the generation by both power plants.

VERIFICATION OUTCOME
Report (Public) Verification Report (public)
Verification report date 2026-06-23
First Request for Registration Date 2023-09-06
Opinion

LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “200 MW Solar Project in Tamil Nadu”. The verification is performed on the basis of GCC criteria project verification standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting.

The review of the final version of GCC PSF and the subsequent Onsite audit has provided Applus+ Certification with sufficient evidence to determine the fulfillment of stated criteria. In our opinion, the project meets all relevant GCC project standard requirements for the GCC. The project will hence be recommended by LGAI Technological Center S.A. (Applus+ Certification) for registration with the GCC.

By displacing fossil fuel-based electricity with electricity generated from a renewable source, the project results in reductions of CO2 emissions that are real, measurable and give long-term benefits to the mitigation of climate change. Emission reductions attributable to the project are hence additional to any that would occur in the absence of the project activity. Given that the project is implemented as designed, the project is likely to achieve the estimated amount of annual emission reductions of 308,086 tCO2e per year.

The verification has been performed following the requirements of the latest version of GCC verification standard, Version 03.1, GCC Project Standard, version 03.1 and on the basis of the contractual agreement.

In detail the conclusions can be summarized as follows:

-         The project does not result in negative social, environmental and/or economic impacts.

-         The project contribution to Environment, Social Development and Economic and technological development

-         The project additionality is sufficiently justified in the GCC PSF.

-         Conservative assumptions were applied in the project description.

-         The monitoring plan of SDG parameters is transparent and adequate.

-         The project meets the local stakeholder consultation requirements.

      The conclusions of this report show, that the project, as it was described in the project documentation, is in line with all criteria applicable for the verification.