Project Submission No. | S00467 |
---|---|
Project Title | 200 MW Solar Project in Tamilnadu |
Project Owner(s) (as per PSF & LOA) | Narbheram Power and Steel Private Limited |
Submission Date | 2022-06-08 |
Global Stakeholder Consultation Period |
2022-10-05 to 2022-10-19 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources (Version 21.0) |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
India
|
---|---|
Focal Point of Project Owners
|
Narbheram Power and Steel Private Ltd |
Email of Contact Person of FP (Primary) | binay.goenka@athagroup.in |
Email of Contact Person of FP (Secondary) | gaurav.bhattacharjee@athagroup.in |
Name of Authorized External Representative Organization | INFINITE ENVIRONMENT SOLUTIONS LLP |
Name of Focal Point of External Representative | Jimmy Sah |
Email-id of External representative | jimmy@infisolutions.org |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | The proposed project activity involves the installation of new grid-connected Solar Power Projects in Thoothukudi, Tamil Nadu State of India at sites where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project has developed by two SPV Narbheram Solar TN Private Limited and NVR Energy Private Limited part of group Atha Group. The electricity generated from Project Activity is exported to the Indian grid there by displacing the consumption of electricity from the regional grid electricity distribution system. The total installed capacity of the proposed project activity is 200 MW, which involves operation of two solar projects of 100 MW each in Tamil Nadu. |
---|---|
Additional Information | The crediting period chosen for the project activity “200 MW Solar Project in Tamil Nadu” is 10 years Crediting Period. The annual average estimated emission reductions from project activity are 310,862 tCO2e/annum. Over the entire crediting period the project will reduce 3,108,621tCO2 |