| Project Submission No. | S00467 |
|---|---|
| Project Title | 200 MW Solar Project in Tamilnadu |
| Project Owner(s) (as per PSF & LOA) | Narbheram Power and Steel Private Limited |
| Submission Date | 2022-06-08 |
| Global Stakeholder Consultation Period |
2022-10-05 to 2022-10-19 |
| Registration Date | 2026-07-20 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources (Version 21.0) |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
| Verified Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Narbheram Power and Steel Private Ltd |
| Email of Contact Person of FP (Primary) | binay.goenka@athagroup.in |
| Email of Contact Person of FP (Secondary) | gaurav.bhattacharjee@athagroup.in |
| Name of Authorized External Representative Organization | Narbheram Power and Steel Private Limited |
| Name of Focal Point of External Representative | Mr. Binay Goenka |
| Email-id of External representative | binay.goenka@athagroup.in |
| Project Verifier | LGAI TECHNOLOGICAL CENTER, S.A. |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The project activity involves the installation of new grid-connected Solar Power Projects in Thoothukudi, Tamil Nadu State of India at sites where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project has developed by two SPV Narbheram Solar TN Private Limited and NVR Energy Private Limited part of group Atha Group. The electricity generated from Project Activity is exported to the Indian grid there by displacing the consumption of electricity from the regional grid electricity distribution system. The total installed capacity of the proposed project activity is 200 MW, which involves operation of two solar projects of 100 MW each in Tamil Nadu. |
|---|---|
| Additional Information | The crediting period chosen for the project activity “200 MW Solar Project in Tamil Nadu” is 10 years crediting period. The annual average estimated emission reductions from project activity are 308,086 tCO2e/annum. Over the entire crediting period of 10 years the project will reduce 3,080,860 tCO2e, thereon displacing average 330,919.43 MWh/year and a total of 3,309,194.30 MWh amount of electricity from the generation by both power plants. |
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2026-06-23 |
| First Request for Registration Date | 2023-09-06 |
| Opinion | LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “200 MW Solar Project in Tamil Nadu”. The verification is performed on the basis of GCC criteria project verification standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting. The review of the final version of GCC PSF and the subsequent Onsite audit has provided Applus+ Certification with sufficient evidence to determine the fulfillment of stated criteria. In our opinion, the project meets all relevant GCC project standard requirements for the GCC. The project will hence be recommended by LGAI Technological Center S.A. (Applus+ Certification) for registration with the GCC. By displacing fossil fuel-based electricity with electricity generated from a renewable source, the project results in reductions of CO2 emissions that are real, measurable and give long-term benefits to the mitigation of climate change. Emission reductions attributable to the project are hence additional to any that would occur in the absence of the project activity. Given that the project is implemented as designed, the project is likely to achieve the estimated amount of annual emission reductions of 308,086 tCO2e per year. The verification has been performed following the requirements of the latest version of GCC verification standard, Version 03.1, GCC Project Standard, version 03.1 and on the basis of the contractual agreement. In detail the conclusions can be summarized as follows: - The project does not result in negative social, environmental and/or economic impacts. - The project contribution to Environment, Social Development and Economic and technological development - The project additionality is sufficiently justified in the GCC PSF. - Conservative assumptions were applied in the project description. - The monitoring plan of SDG parameters is transparent and adequate. - The project meets the local stakeholder consultation requirements. The conclusions of this report show, that the project, as it was described in the project documentation, is in line with all criteria applicable for the verification. |