PROJECT DETAILS

Project Submission No. S00716
Project Title Ningyang Fushan Photovoltaic Greenhouse Power Project
Project Owner (as per PSF & LOA) Beijing BOE Energy Technology Co., Ltd.
Focal Point of Project Owners*(FP)
Beijing BOE Energy Technology Co., Ltd.
Email of Contact Person of FP (Primary) zhangxiaomeng@boe.com.cn
Email of Contact Person of FP (Secondary) zhangxiaomeng@boe.com.cn
Country China
Submission Date 8 Jun 2022
Global Stakeholder Consultation Period 12 Dec 2022 - 26 Dec 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 21624
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 7, 8, 9
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Ningyang Fushan Photovoltaic Greenhouse Power Project (hereafter referred to as “the Project” or 
“the proposed project”) is a solar photovoltaic power project with a total installed capacity of 19.96MW. 
The Project locates at Zerun Agricultural Greenhouse Base, Zhangzhuang Village, Fushan Town, 
Ningyang County, Shandong Province, China.


The purpose of the Project is to utilize the solar energy at the project site to generate and supply 
electricity to Northern China Power Grid (NCPG). The spatial extent of the project boundary includes 
the project power plant and all power plants connected physically to NCPG that the project is 
connected to.


Prior to the implementation of the Project, the electricity delivered to the grid by the project activity 
would be generated by the operation of grid-connected power plants and by the addition of new 
generation sources into the NCPG. This is also the baseline scenario.


The Project is a renewable energy project and is expected to supply an annual average of 26152MWh 
of zero-emission electricity to NCPG during the fixed 10-year crediting period, which will replace 
power generation of those fossil fuel-fired power plants delivered to the NCPG under the baseline 
scenario. The project is expected to achieve a green-house gas emission reduction of 21624tCO2e 
annually. The total emission reductions during the fixed 10-year crediting period will be 216245tCO2e. 


The project is expected to contribute to 4 SDGs which are SDG 7, 8, 9,13.

Additional Information