PROJECT DETAILS

Project Submission No. S00581
Project Title Wangpo coal mine 7.5MW CMM generation project
Project Owner (as per PSF & LOA) Juno Carbon Investment & EP Tech (Beijing) Co., Ltd
Focal Point of Project Owners*(FP)
Juno Carbon Investment & EP Tech (Beijing) Co., Ltd
Email of Contact Person of FP (Primary) zhaomingyuan@junocapital.cn
Email of Contact Person of FP (Secondary) li.gloria@junocapital.cn
Country China
Submission Date 8 Jun 2022
Global Stakeholder Consultation Period 8 Nov 2022 - 22 Nov 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0008 Version 08.0
Forecasted GHG Emission Reduction(TCO2/Year) 249,279
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 8,9,11,13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Wangpo coal mine 7.5MW CMM generation project (hereafter referred to as “the project”) is a CMM power project with total installed capacity of 7.5MWMW. The project is invested and operated by Jincheng Dubao Power Development Co., Ltd. The project locates in Tali Village, Xiacun Town, Zezhou County, Jincheng City, Shanxi Province, People’s Republic of China.The purpose of the project is to utilize the CMM from the Wangpo coal mine to generate and supply electricity to North China Power Grid (NCPG).Prior to the implementation of the project, the coal mine methane (CMM) gas extracted due to safety reasons from the Wangpo coal mine would be vented into the atmosphere. The project activity will utilize low-concentration CMM with an average concentration of 15% for power generation. Annually it will destroy 14,482,800 m3 of pure methane and generate 51,200 MWh of net electricity per year. The project is far away from the surrounding heat users, and there are isolated mountains in the middle, and the local heat pipe network system is not perfect. Therefore, the utilization of unit waste heat is not considered in this project .Thus the project reduces green house gas such as CH4 and CO2.The project is expected to achieve a green-house gas emission reduction of 249,279 tCO2e annually. The total emission reductions during the fixed 10-year crediting period will be 2,492,789 tCO2e.