PROJECT DETAILS

Project Submission No. S00084
Project Title Girlevik-3 Karatuş Hydro Power Plant, Turkey
Project Owner (as per PSF & LOA) 1. Yusaka Enerji Elektrik Üretim A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Türkiye
Submission Date 10 Nov 2021
Global Stakeholder Consultation Period 23 Jan 2022 - 6 Feb 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0
Forecasted GHG Emission Reduction(TCO2/Year) 8,623
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG9, SDG 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Girlevik – 3 Karatuş Hydro Power Plant has been developed by Yusaka Enerji Elektrik Üretim A.Ş.. The project area is located in Erzincan Province, Merkez District, Fırat Basin, VIII. DSI. The project consist of 2 units each having 1.795 MWm /1.727 MWe. Total installed capacity is 3.59 MWm / 3.454 MWe. Annual electricity production is expected to be 15.531 GWh according to the generation license. The project is licensed on 26/10/2017. The average annual generated energy is expected to be 15,531 MWh according to the generation license and the project will be able to deliver a reduction in emissions of around 8,623 tCO2e (tons of carbon dioxide equivalent) annually.

Additional Information