Project Submission No. | S00084 |
---|---|
Project Title | Girlevik-3 Karatuş Hydro Power Plant, Turkey |
Project Owner(s) (as per PSF & LOA) | 1. Yusaka Enerji Elektrik Üretim A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (focal point to act on behalf of all Project Owners) |
Submission Date | 2021-11-10 |
Global Stakeholder Consultation Period |
2022-01-23 to 2022-02-06 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Hydro Power |
GCC/CDM Methodology & Version | AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 8,623 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | C+ - Pilot Phase |
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Girlevik – 3 Karatuş Hydro Power Plant has been developed by Yusaka Enerji Elektrik Üretim A.Ş.. The project area is located in Erzincan Province, Merkez District, Fırat Basin, VIII. DSI. The project consist of 2 units each having 1.795 MWm /1.727 MWe. Total installed capacity is 3.59 MWm / 3.454 MWe. Annual electricity production is expected to be 15.531 GWh according to the generation license. The project is licensed on 26/10/2017. The average annual generated energy is expected to be 15,531 MWh according to the generation license and the project will be able to deliver a reduction in emissions of around 8,623 tCO2e (tons of carbon dioxide equivalent) annually. |
---|