IMPORTANT UPDATE: We are migrating to GCC 2.0. We have restricted new projects registration and further updates to migrated project. Please visit to GCC 2.0.

PROJECT DETAILS

Project Submission No. S00352
Project Title Akdağ Wind Power Plant
Project Owner(s) (as per PSF & LOA) 1. Ahsen Enerji Üretim Tic. ve San. A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Submission Date 2022-06-08
Global Stakeholder Consultation Period 2022-09-11 to
2022-09-25
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 47,630
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Türkiye
Focal Point of Project Owners
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Name of Authorized External Representative Organization Desilyon Danışmanlık Ticaret A.Ş.
Name of Focal Point of External Representative Özlem Özkapı
Email-id of External representative ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Ahsen Enerji Üretim Tic. ve San. A.Ş. has constructed the Akdağ Wind Power Plant Project. The aim of the project is to produce electrical energy from wind to supply the Turkish national grid.
The project includes 9 units. They have 23.625 MWm/ 25 MWe installed capacity. The average annual generated energy is expected to be  74,487 MWh annually and the project will be able to deliver a reduction in emissions of around 47,630  tCO2e (tons of carbon dioxide equivalent) annually. For the entire crediting period, 476,299 tonnes of CO2 are expected to be reduced.

© 2025 Global Carbon Council