PROJECT DETAILS

Project Submission No. S00373
Project Title Haitianda Hoboksar 30MW Photovoltaic Power Station Project
Project Owner (as per PSF & LOA) Carbon Road Limited
Focal Point of Project Owners*(FP)
Carbon Road Limited
Email of Contact Person of FP (Primary) qili@carbonroad.com
Email of Contact Person of FP (Secondary) zhenghuang@carbonroad.com
Country China
Submission Date 8 Jun 2022
Global Stakeholder Consultation Period 14 Sep 2022 - 28 Sep 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0)
Forecasted GHG Emission Reduction(TCO2/Year) 32,970
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals #7, #8
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Haitianda Hoboksar 30MW Photovoltaic Power Station Project is located in Hoboksar town, Tacheng district, Xinjiang Uygur Autonomous Region of the People’s Republic of China. The purpose of the project is to utilize the solar energy at the project site to generate and supply electricity to the North West Power Grid (NWPG).

The project is a renewable energy project and is expected to supply an annual average of 42,307 MWh of zero-emission electricity to the NWPG during the fixed 10-year crediting period, which replace the power generation of those fossil fuel-fired power plants delivered to the NWPG under the baseline scenario. The project is expected to achieve greenhouse gas emission reductions of 32,970 tCO2e annually. The total emission reductions during the fixed 10-year crediting period are 329,700 tCO2e.

Additional Information