IMPORTANT UPDATE: We are migrating to GCC 2.0. We have restricted new projects registration and further updates to migrated project. Please visit to GCC 2.0.

PROJECT DETAILS

Project Submission No. S00532
Project Title Yılmaz Wind Power Plant
Project Owner(s) (as per PSF & LOA) 1. Çapar Elektrik Üretim A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Submission Date 2022-06-07
Global Stakeholder Consultation Period 2022-10-23 to
2022-11-06
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version AMS-I.D: Grid connected renewable electricity generation – Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 30,688
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Türkiye
Focal Point of Project Owners
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Çapar Elektrik Üretim A.Ş. has constructed the Yılmaz Wind Power Plant Project. The aim of the project is to produce electrical energy from wind to supply the Turkish national grid.

By means of reducing dependency to the fossil fuels, environmental pollution is significantly reduced. Also, clean energy is generated by using wind power. Regarding to this, Çapar Elektrik Üretim A.Ş. constructed a wind power plant in İzmir district, Menemen province, Türkiye. Based on the applied tool, the project boundary is considered as the National Electricity Grid of Türkiye. The baseline scenario refers to the energy generation from the fossil fuels.

The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. Total installed capacity is 12.5 Mwe. The average annual generated energy is expected to be 47,300,000 kWh and the project will be able to deliver a reduction in emissions of around 30688 tCO2e (tons of carbon dioxide equivalent) annually. For the entire crediting period, 306,880 tonnes of CO2 are expected to be reduced.

© 2025 Global Carbon Council