PROJECT DETAILS

Project Submission No. S00532
Project Title Yılmaz Wind Power Plant
Project Owner (as per PSF & LOA) 1. Çapar Elektrik Üretim A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Türkiye
Submission Date 7 Jun 2022
Global Stakeholder Consultation Period 23 Oct 2022 - 6 Nov 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D: Grid connected renewable electricity generation – Version 18.0
Forecasted GHG Emission Reduction(TCO2/Year) 32,410
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 11, SDG 13
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Çapar Elektrik Üretim A.Ş. has constructed the Yılmaz Wind Power Plant Project. The aim of the project is to produce electrical energy from wind to supply the Turkish national grid. Çapar Elektrik Üretim A.Ş. constructed a wind power plant in İzmir district, Menemen province, Turkey. The total installed capacity of the plant is 12.5 MW. Annual electricity production is expected to be 50,000,000 kWh. the project will be able to deliver a reduction in emissions of around 32,410 tCO2e (tons of carbon dioxide equivalent) annually. For the entire crediting period, 324,100 tonnes of CO2 are expected to be reduced.