PROJECT DETAILS

Project Submission No. S00314
Project Title 10 MW Solar Project in Karnataka
Project Owner(s) (as per PSF & LOA) Narbheram Power and Steel Private Limited
Submission Date 2022-06-07
Global Stakeholder Consultation Period 2022-08-18 to
2022-09-01
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, Version 4.0
Forecasted GHG Emission Reduction (tCO2e/Year) 16,714
Forecasted E+ Label Yes
Verified E+ Label
Forecasted S+ Label Yes
Verified S+ Label
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility
Location Details Open Full Map
Country
 India
Focal Point of Project Owners
Narbheram Power and Steel Private Ltd
Email of Contact Person of FP (Primary) binay.goenka@athagroup.in
Email of Contact Person of FP (Secondary) gaurav.bhattacharjee@athagroup.in
Name of Authorized External Representative Organization Narbheram Power and Steel Private Limited
Name of Focal Point of External Representative Mr. Binay Goenka
Email-id of External representative binay.goenka@athagroup.in
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The project activity is a green field project, installation of a new grid-connected 10 MW Solar power plant/unit at a site. The project activity is solar power project, which is being implemented Karnataka State in India by Celestial Solar Solutions Private Limited. The electricity generated from Project Activity is exported to the Indian grid there by displacing the consumption of electricity from the Indian grid electricity distribution system. The solar power project is promoted by Celestial Solar Solutions Private Limited.

The electricity generated by the project “Celestial Solar Solutions Private Limited” will thus replace the equivalent amount of electricity generated by the operation of existing grid connected power plants (mostly fossil fuel-based power plants).

Additional Information

The crediting period chosen for the project activity “10 MW Solar Project in Karnataka” is 10 years Crediting Period in which total GHG emission reduction estimated is 167,146 tCO2. The annual average estimated emission reductions from project activity are 16,714 tCO2e/annum.