PROJECT DETAILS

Project Submission No. S00089
Project Title Saral-3 Regulator and Hydro Power Plant
Project Owner (as per PSF & LOA) 1. KRD Van Elektrik Üretim A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Turkey
Submission Date 8 Nov 2021
Global Stakeholder Consultation Period 31 Jan 2022 - 14 Feb 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0
Forecasted GHG Emission Reduction(TCO2/Year) 15,235
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

KRD Van Elektrik Üretim A.Ş. has constructed the Saral-3 Regulator and Hydro Power Plant Project. The aim of the project is to produce electrical energy to the Turkish national grid. KRD Van Elektrik Üretim A.Ş. constructed a hydropower plant in Çatak district, Van province, Turkey. The project includes 2 sections which are HES-3 and HES-4. HES-4 has not been installed and commissioned yet. It has been planned to be installed at 16/03/2023. In HES-4, there will be 2 units where they will have 3.045 MWm / 2.915 MWe capacity for each. The other section is HES-3 which has been installed and operated. In HES-3, there are 3 units. Two of them have 2.410 MWm / 2.300 MWe installed capacity. The other one has 0.904 MWm / 0.800 MWe installed capacity. The total installed capacity of commissioned units is 5.724 MWm / 5.400 MWe. Annual electricity production is expected to be 26.700 GWh for HES-3 according to the generation license. The generation license is signed on 16/01/2020. The average annual generated electricity is expected to be 26,700 MWh according to the generation license and the emission reduction is estimated around 15,235 tCO2e per annum. For the entire crediting period, 152,350 tonnes of CO2 are expected to be reduced.

Additional Information