PROJECT DETAILS

Project Submission No. S00383
Project Title Bundled Solar Power Project 1 by Aloha Turistik Hizmetler A.Ş.
Project Owner (as per PSF & LOA) EKI Energy Services Limited (Act as project owner) ; Aloha Turistik Hizmetler A.Ş. ; Akım Güneş Enerjisi Sanayi ve Ticaret Anonim Şirketi.
Submission Date 6 Jun 2022
Global Stakeholder Consultation Period 15 Sep 2022 - 29 Sep 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0.
Forecasted GHG Emission Reduction (tCO2e/Year) 12,738 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Location Details Open Full Map
Country Türkiye
Focal Point of Project Owners (FP)
EKI Energy Services Limited
Email of Contact Person of FP (Primary) manish@enkingint.org
Email of Contact Person of FP (Secondary) naveen@enkingint.org
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The purpose of the project is to help Türkiye to stimulate and commercialize the use of grid connected renewable energy technologies and markets. Furthermore, the project will demonstrate the viability of grid connected solar farms which can support improved energy security, improved air quality, alternative sustainable energy futures, improved local livelihoods and sustainable renewable energy industry development.

Additional Information

Over the first 10 years crediting period, the project will replace anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 12,738 tCO2e/year for all projects, thereon displacing 19,634 MWh/year amount of electricity during the 10-year crediting period from the generation-mix of power plants connected to the Turkish grid, which is mainly dominated by thermal/fossil fuel-based power plant. The total estimated emission reductions for the current crediting period of 10 years are 127,382 tCO2e.

VERIFICATION OUTCOME
Opinion

LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “Bundled Solar Power Project 1 by Aloha Turistik Hizmetler A.Ş”. The verification is performed on the basis of GCC criteria project verification standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting.

The review of the final version of GCC PSF and the subsequent remote audit / follow-up interviews has provided Applus+ Certification with sufficient evidence to determine the fulfillment of stated criteria. In our opinion, the project meets all relevant GCC project standard requirements for the GCC. The project will hence be recommended by LGAI Technological Center S.A. (Applus+ Certification) for registration with the GCC.

By displacing fossil fuel-based electricity with electricity generated from a renewable source, the project results in reductions of CO2 emissions that are real, measurable and give long-term benefits to the mitigation of climate change. Emission reductions attributable to the project are hence additional to any that would occur in the absence of the project activity. Given that the project is implemented as designed, the project is likely to achieve the estimated amount of annual emission reductions of 12,738tCO2e per year.

The verification has been performed following the requirements of the latest version of GCC verification standard, Version 03.1, GCC Project Standard, version 03.1 and on the basis of the contractual agreement.

In detail the conclusions can be summarized as follows:

-         The project does not result in negative social, environmental and/or economic impacts.

-         The project contribution to Environment, Social Development and Economic and technological development

-         The project additionality is sufficiently justified in the GCC PSF.

-         The Project has correctly described the Project Activity in the Project Submission Form including the applicability of the approved methodology AMS-I.D., Version 18.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

-         The Project is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and

-         The monitoring plan of SDG parameters is transparent and adequate.

-         The project meets the local stakeholder consultation requirements.

-         The project is likely to contribute to CORSIA Eligible Emission Units and has CORSIA Label (C+) certification valid till 31 December 2020. A written attestation from the Host country on double counting is not required until 31 December 2020 and the project was found meeting the applicable requirements prescribed by ICAO.

The conclusions of this report show, that the project, as it was described in the project documentation, is in line with all criteria applicable for the verification.

Report (Public) Verification Report (public)
Verification report date 2023-09-07
First Request for Registration Date 2023-09-14
© 2024 Global Carbon Council