Project Submission No. | S00053 |
---|---|
Project Title | Karatas-I Regulator and Hydro Power Plant |
Project Owner(s) (as per PSF & LOA) | 1. Karaca HES Enerji Üretim A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (focal point to act on behalf of all Project Owners) |
Submission Date | 2021-11-08 |
Global Stakeholder Consultation Period |
2021-12-23 to 2022-01-06 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Hydro Power |
GCC/CDM Methodology & Version | AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() ![]() |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | C+ - Pilot Phase |
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Name of Authorized External Representative Organization | Desilyon Danışmanlık Ticaret A.Ş. |
Name of Focal Point of External Representative | Özlem Özkapı |
Email-id of External representative | ozlem@desilyon.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Karaca HES Enerji Üretim A.Ş. has constructed the Karataş-I Regulator and Hydro Power Plant Project.The aim of the project is to produce electrical energy to the Turkish national grid. The project includes 3 units. The total installed capacity is 9,517 MWe / 9,914 MWm. The generation license is signed on 03/03/2011. The average annual generated electricity is expected to be 42,681 MWh according to the generation license and the emission reduction is estimated around 24,354 tCO2e annually. |
---|