IMPORTANT UPDATE: We are migrating to GCC 2.0. We have restricted new projects registration and further updates to migrated project. Please visit to GCC 2.0.

PROJECT DETAILS

Project Submission No. S00288
Project Title Renewable Power Project in Jaisalmer, Rajasthan-2
Project Owner(s) (as per PSF & LOA) Adani Hybrid Energy Jaisalmer One Limited; Adani Hybrid Energy Jaisalmer Two Limited; Adani Hybrid Energy Jaisalmer Three Limited and Adani Green Energy Limited
Submission Date 2022-06-04
Global Stakeholder Consultation Period 2022-08-03 to
2022-08-17
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar/Wind Hybrid
GCC/CDM Methodology & Version GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, Ver 040
Forecasted GHG Emission Reduction (tCO2e/Year) 3,026,126
Forecasted E+ Label Yes
Verified E+ Label
Forecasted S+ Label Yes
Verified S+ Label
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label
Forecasted Market Eligibility
Verified Market Eligibility
Location Details Open Full Map
Country
 India
Focal Point of Project Owners
Adani Green Energy Limited
Email of Contact Person of FP (Primary) emission.reductions@adani.com
Email of Contact Person of FP (Secondary) sandip.saha@adani.com
Email-id of External representative emission.reductions@adani.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The Project Owner has installed 990 MW bundle wind-solar hybrid power plant consisting of two bundle of 390MW and 600MW projects. The proposed Wind-solar hybrid Project, 390MW is located in Madhopura, Jaisalmer, Rajasthan and 600MW is located in Kajasar, Jaisalmer, Rajasthan. In the absence of the project activity, no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project boundary involves hybrid bundled solar and wind power plant and the generation system and the connected utility system to the Indian grid. The project activity involves setting up of wind and solar hybrid power project to harness their energy to produce electricity and supply to the grid. In the absence of the project activity, the equivalent amount of power would have been supplied by the Power plants in the Indian grid, which is fed mainly by fossil fuels plants.

The project activity is wind-solar hybrid power project which is being implemented in Rajasthan, that supplies power to the Solar Energy Corporation of India (SECI), an intermediary in procuring power in-line with the Guidelines for Tariff based Competitive bidding process for the procurement of power, from grid connected project. The power generated from the project activity is fed into the respective substation and Indian National Grid, thereby reducing greenhouse gas emission reduction into the atmosphere. 

Additional Information

The amount of power generated is 3,252,150 MWh/year and has achieved 3,026,126 tCO2e/Annum that is equivalent to 30,261,260 tCO2 for the entire crediting period of 10 years.

© 2025 Global Carbon Council