Project Submission No. | S00708 |
---|---|
Project Title | Erkar LFG Power Plant |
Project Owner (as per PSF & LOA) | • GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S (GTE) • Erkar Yenilenebilir Enerji A.Ş. |
Focal Point of Project Owners*(FP)
|
GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S |
Email of Contact Person of FP (Primary) | kemal.demirkol@gte.com.tr |
Email of Contact Person of FP (Secondary) | ercument.kayaa@gmail.com |
Country | Türkiye |
Submission Date | 3 Jun 2022 |
Global Stakeholder Consultation Period | 11 Dec 2022 - 25 Dec 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0001 version 19.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 20,897 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 7,8 and 12 |
Forecasted SDG+ Label | Platinum |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Erkar LFG Power Plant is located in Erzincan Province of Turkey. Before the proposed project activity, the wastes were left to decay within the Erzincan landfill site and methane was emitted into the atmosphere without any control or utilization. The proposed activity involves the collection of landfill gas (LFG) through solid waste management and using it for electricity generation. Electricity generated is fed to the national grid. |
---|---|
Additional Information |