PROJECT DETAILS

Project Submission No. S00310
Project Title Evrencik WPP
Project Owner (as per PSF & LOA) Evrencik Rüzgar Enerjisinden Elektrik Üretim A.Ş.; SEKANS ENERJİ LİMİTED ŞİRKETİ
Focal Point of Project Owners*(FP)
Sekans Enerji Limited Sirketi
Email of Contact Person of FP (Primary) sila@sekansdanismanlik.com
Email of Contact Person of FP (Secondary) deniz@sekansdanismanlik.com
Country Türkiye
Submission Date 3 Jun 2022
Global Stakeholder Consultation Period 15 Aug 2022 - 29 Aug 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version CDM Approved ACM0002 Grid-connected electricity generation from renewable sources, version 20.0
Forecasted GHG Emission Reduction(TCO2/Year) 278,726
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 7, 8, 9, 11
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization -
Name of Focal Point of External Representative -
Email-id of Focal Point sila@sekansdanismanlik.com
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Evrencik WPP is a new built wind power plant, located in Kırklareli Province, Turkey owned by Evrencik Rüzgar Enerjisinden Elektrik Üretim Anonim Şirketi. The generation license of the project was issued in 13/01/2022 for 49 years. The project has an installed capacity of 129.60 MWm/129.60 MWe and the annual generation is estimated to be 430,000 MWh. 

The purpose of the Project is to produce renewable electricity using wind as the power source and to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by the grid dominated with fossil fired power plants. The annual emission reduction estimated by the project is 278,726 tonnes of CO2. During the crediting period, 2,787,399 tonnes of CO2 are expected to be reduced