PROJECT DETAILS

Project Submission No. S00297
Project Title Yayla Solar Power Plant Bundle
Project Owner (as per PSF & LOA) 1. GMC Solar İnşaat Taahhüt Gıda Enerji Üretim Sanayi ve Ticaret A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Turkey
Submission Date 2 Jun 2022
Global Stakeholder Consultation Period 9 Aug 2022 - 23 Aug 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 27,853
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 11, SDG 13
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Yayla Solar Power Plant Bundle constructed by GMC Solar İnşaat Taahhüt Gıda Enerji Üretim Sanayi ve Ticaret A.Ş.. The purpose of the project is to generate clean energy by using solar power and providing the energy to the Turkish national grid. GMC Solar İnşaat Taahhüt Gıda Enerji Üretim Sanayi ve Ticaret A.Ş. consists of 27 individual Unlicensed Solar Power Plants with a capacity of 25.993 MWe / 27.770 MWp in total. The total installed capacity is 25.993 MWe. Average annual generated energy is expected to be 49,386,7 MWh and emission reduction is expected around 32,012 tCO2e (tons of carbon dioxide equivalent) from 2019 per annum. Annual average electricity generation over crediting period is about 42,970.3 MWh and annual average reduction in emission is about 27,853 tCO2e. For the entire crediting period, 278,533 tCO2e tons of CO2 are expected to be reduced.