| Project Submission No. | S00027 |
|---|---|
| Project Title | Solar Power Project in Bikaner Rajasthan by Avaada Sunce Energy |
| Project Owner(s) (as per PSF & LOA) | Avaada Energy Private Limited |
| Submission Date | 2021-11-02 |
| Global Stakeholder Consultation Period |
2021-11-18 to 2021-12-02 |
| Registration Date | 2026-01-12 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | |
| Verified Market Eligibility |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Emergent Ventures India Pvt. Ltd. |
| Email of Contact Person of FP (Primary) | atul.sanghal@emergent-ventures.com |
| Email of Contact Person of FP (Secondary) | jatin@emergent-ventures.com |
| Name of Authorized External Representative Organization | Emergent Ventures India Pvt. Ltd. |
| Name of Focal Point of External Representative | Atul Sanghal |
| Email-id of External representative | atul.sanghal@emergent-ventures.com |
| Project Verifier | KBS CERTIFICATION SERVICES PVT. LTD. |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The purpose of project activity is to generate and feed to the connected national electricity grid of India GHG free electricity by the installation of a 350MWac solar power project. The project activity is located at Village Bherookheera, District Bikaner, State Rajasthan, in India. The project boundary includes the project site where the plant has been installed, power evacuation infrastructure including the other power stations feeding to the connected electricity grid, energy metering points, switch yards and other civil constructs. The baseline of the project activity is continued generation of electricity in the national grid of India. The electricity generation in India is highly carbon intensive. According to the latest data from Central Electricity Authority on carbon intensity of grid electricity, the combined margin emission factor of the grid electricity is 0.9305 tCO2e/MWh and therefore electricity generation from solar power project as in the project activity results into emission reductions. It is estimated that the project activity will effect a cumulative GHG emission reduction of 6,635,297 tCO2e over 10 year period of project activity. |
|---|
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2026-01-09 |
| First Request for Registration Date | 2022-05-13 |
| Opinion | The GCC Project Verifier, KBS Certification Services Ltd., has verified and certified that the GCC Project Activity – ‘Solar Power Project in Bikaner Rajasthan by Avaada Sunce Energy’ has |