PROJECT DETAILS

Project Submission No. S00528
Project Title Sichuan Yuwa 49MW Hydro Power Project
Project Owner (as per PSF & LOA) Carbon Road Limited
Submission Date 1 Jun 2022
Global Stakeholder Consultation Period 20 Oct 2022 - 3 Nov 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources (Version 21.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 113,903 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Location Details Open Full Map
Country China
Focal Point of Project Owners (FP)
Carbon Road Limited
Email of Contact Person of FP (Primary) project@carbonroad.com
Email of Contact Person of FP (Secondary) tiantainsteven@126.com
Name of Authorized External Representative Organization Carbon Road Limited
Name of Focal Point of External Representative haochen wang
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Sichuan Yuwa 49MW Hydro Power Project is a hydro power project with a total installed capacity of 49MW. Invested and operated by Jiuzhaigou Hydropower Development Co., Ltd., the project is located in Jiuzhaigou town, A Ba prefecture, Sichuan province of the People’s Republic of China.

The project is a renewable energy project and is expected to supply an annual average of 199,097 MWh of zero-emission electricity to the CCPG during the fixed 10-year crediting period, which replace the power generation of those fossil fuel-fired power plants delivered to the CCPG under the baseline scenario. The project is expected to achieve greenhouse gas emission reductions of 113,903 tCO2e annually. The total emission reductions during the fixed 10-year crediting period are 1,139,030 tCO2e.

Additional Information
VERIFICATION OUTCOME
Opinion

CTI Certification Co., LTD (CTI) was contracted by Carbon Road Limited. on behalf of GCC project owner Jiuzhaigou Hydropower Development Co., Ltd. for verification of the project activity “Sichuan Yuwa 49MW Hydro Power Project” in China, Whereas as per HCLOA dated 20/05/2022, the Project owner is “Carbon Road Limited., who is the focal point authorized to communicate with the GCC Verifier 

The objectives of this project verification is to validate that the GCC project meets the requirements of GCC project framework v2.1, GCC program manual v3.1 /1/, GCC program processes v4.0, GCC project standard v3.1 /2/, GCC project sustainability standard v3.1 /5/, GCC verification standard v3.1 /3/, GCC Environment & Social safeguards standard v3.0 /4/, ISO 14064-2 & ISO 14064-3, applicable approved GCC “Methodology for Grid Connected Renewable Energy Generation Projects” ACM0002: “Grid-connected electricity generation from renewable sources”, Version 21.0 /8/, Applicable Legal requirements/rules of host country, National Sustainable Development Criteria and CORSIA requirements and other GCC  requirements related to aspects such as project design, applicable conditions, project boundary, baseline scenarios, additionality, emission reduction, monitoring plan, local stakeholder consultation, global stakeholder consultation, GHG emission reductions (ACCs), environmental no-net harm label (E+), social no net harm label (S+), Gold SDG label (SDG+), CORSIA+. This report summarizes the final project verification opinion which is based on Project Submission Form Version 4.3.

The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.3 paragraph 23-25, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project.”

The project activity is a hydro power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring ACM0002: “Grid-connected electricity generation from renewable sources”, Version 21.0 /8/ and is assessed against latest valid PS, VS and Environment and Social Safeguards Standard and/or other applicable GCC/GCC Decisions/Tools/Guidance/Forms. 

The project activity is likely to achieve the anticipated emission reductions stated in the PSF /20/ provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 113,903 tCO2e/year over the selected Fixed 10 years crediting period starting from 25/04/2017. The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. 

CTI has informed the project owners of the verification outcome through the draft verification report and final verification report. The final verification report contains the information with regard to fulfilment of the requirements for verification, as appropriate. 

CTI applied the following verification process and methodology using a competent verification team; 

the desk review of documents and evidences submitted by the project owner in context of the reference GCC rules and guidelines issued, 

undertaking/conducting site visit, interview or interactions with the representative of the project owner, 

reporting audit findings with respect to clarifications and non-conformities and the closure of the findings, as appropriate and preparing a draft verification opinion based on the auditing findings and conclusions technical review of the draft verification opinion along with other documents as appropriate by an independent competent technical review team finalization of the verification opinion (this report) 

CTI Certification Co., LTD (CTI) has verified and hereby certifies that the GCC project activity “Sichuan Yuwa 49MW Hydro Power Project”: 

a. has correctly described the Project Activity in the Project Submission Form (Version 4.3, Dated 01/04/2024) including the applicability of the approved methodology ACM0002: “Grid-connected electricity generation from renewable sources”, Version 21.0 /8/ and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real, measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively; 

b. is likely to generate GHG emission reductions amounting to the estimated 113,903 tCO2e as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity; 

c. is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and 

d. is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 4 SDGs, which is likely to achieve the Gold SDG certification label (SDG+).

e. CORSIA eligibility was confirmed. The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 01, v1.3 paragraph 23-25, and the ACCs expected to be issued during the  crediting period is likely to be CORSIA eligible and can be used by  International Airlines for offsetting their emissions during all phases of  CORSIA and therefore request GCC Steering Committee to append  CORSIA Certification label (C+) to this project.; However, Host country Attestation on Double Counting required by CORSIA will provide during the  Emission Reduction verification.

Thus the project activity is being recommended to GCC Steering Committee for request for registration.

Report (Public) Verification Report (public)
Verification report date 2024-04-01
First Request for Registration Date 2023-06-16
© 2024 Global Carbon Council