Project Submission No. | S00817 |
---|---|
Project Title | Köroğlu Dam and Kotanlı Hydroelectric Power Plant |
Project Owner (as per PSF & LOA) | EBD Enerji Üretim ve Ticaret A.Ş. |
Focal Point of Project Owners*(FP)
|
Özer Kutlu Ünal |
Email of Contact Person of FP (Primary) | ozer@unal-group.com |
Email of Contact Person of FP (Secondary) | bilhan@unal-group.com |
Country | Türkiye |
Submission Date | 31 May 2022 |
Global Stakeholder Consultation Period | 12 Jan 2023 - 26 Jan 2023 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
Forecasted GHG Emission Reduction(TCO2/Year) | 137,232 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | SDG 7, SDG 8, SDG 9, SDG 13 |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | Desilyon Danışmanlık Ticaret A.Ş. |
Email-id of Focal Point | ozlem@desilyon.com.tr |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Köroğlu Dam and Kotanlı Hydroelectric Power Plant includes 5 units (turbines) totally where they have (2x3.65) + (2x25.80) + (12.96) MWm / (2x31.35) + (2x25.00) + (12.45) MWe installed capacity. The total installed capacity of the plant is 129.860 MWm / 125.150 MWe. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid The average annual electricity production is expected to be 240.504 GWh according to calculations. And the emission reduction is estimated around 137,232 tCO2e annually. For the entire crediting period, 1,372,319 tonnes of CO2 are expected to be reduced. |
---|---|
Additional Information |