Project Submission No. | S00817 |
---|---|
Project Title | Köroğlu Dam and Kotanlı Hydroelectric Power Plant |
Project Owner(s) (as per PSF & LOA) | EBD Enerji Üretim ve Ticaret A.Ş. |
Submission Date | 2022-05-31 |
Global Stakeholder Consultation Period |
2023-01-12 to 2023-01-26 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Hydro Power |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Özer Kutlu Ünal |
Email of Contact Person of FP (Primary) | ozer@unal-group.com |
Email of Contact Person of FP (Secondary) | bilhan@unal-group.com |
Name of Focal Point of External Representative | Desilyon Danışmanlık Ticaret A.Ş. |
Email-id of External representative | ozlem@desilyon.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Köroğlu Dam and Kotanlı Hydroelectric Power Plant includes 5 units (turbines) totally where they have (2x3.65) + (2x25.80) + (12.96) MWm / (2x31.35) + (2x25.00) + (12.45) MWe installed capacity. The total installed capacity of the plant is 129.860 MWm / 125.150 MWe. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid The average annual electricity production is expected to be 240.504 GWh according to calculations. And the emission reduction is estimated around 137,232 tCO2e annually. For the entire crediting period, 1,372,319 tonnes of CO2 are expected to be reduced. |
---|