PROJECT DETAILS

Project Submission No. S00817
Project Title Köroğlu Dam and Kotanlı Hydroelectric Power Plant
Project Owner (as per PSF & LOA) EBD Enerji Üretim ve Ticaret A.Ş.
Focal Point of Project Owners*(FP)
Özer Kutlu Ünal
Email of Contact Person of FP (Primary) ozer@unal-group.com
Email of Contact Person of FP (Secondary) bilhan@unal-group.com
Country Türkiye
Submission Date 31 May 2022
Global Stakeholder Consultation Period 12 Jan 2023 - 26 Jan 2023
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 137,232
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative Desilyon Danışmanlık Ticaret A.Ş.
Email-id of Focal Point ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Köroğlu Dam and Kotanlı Hydroelectric Power Plant includes 5 units (turbines) totally where they have (2x3.65) + (2x25.80) + (12.96) MWm / (2x31.35) + (2x25.00) + (12.45) MWe installed capacity. The total installed capacity of the plant is 129.860 MWm / 125.150 MWe. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid The average annual electricity production is expected to be 240.504 GWh according to calculations. And the emission reduction is estimated around 137,232 tCO2e annually. For the entire crediting period, 1,372,319 tonnes of CO2 are expected to be reduced.

Additional Information