Project Submission No. | S00658 |
---|---|
Project Title | Yunnan Weixi Daqiaohe Hydro Power Project |
Project Owner (as per PSF & LOA) | Beijing Futron Carbon Energy Technology Co.,Ltd. |
Focal Point of Project Owners*(FP)
|
Beijing Futron Carbon Energy Technology Co.,Ltd |
Email of Contact Person of FP (Primary) | jiangf@foicl.com |
Email of Contact Person of FP (Secondary) | maown@foicl.com |
Country | China |
Submission Date | 31 May 2022 |
Global Stakeholder Consultation Period | 30 Nov 2022 - 14 Dec 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002 & v20.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 41,204 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 7,8,9,13 |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Daqiaohe Hydro Power project located in Weixi County, Diqing Prefecture, Yunnan Province, the People’s Republic of China. The primary objective of the proposed project is to generate renewable electricity to meet the ever-increasing demand in the Yunnan Province and the Southern China Power Grid (SCPG). By reducing dependency on the fossil fuels, environmental pollution is significantly reduced. The proposed project is a Hydro Power Plant project with a capacity of 24 MW. Annual power delivered to grid is expected to be 80,975 MWh, and the annual utilization hour is 3,374h. The average emission reduction is estimated around 41,204 tCO2e annually. The crediting period is 10 years. For the entire crediting period 412,040 tonnes of CO2 are expected to be reduced. |
---|---|
Additional Information |