Project Submission No. | S00257 |
---|---|
Project Title | Sav-Ek Solar Power Plant Bundle |
Project Owner(s) (as per PSF & LOA) | 1. Saves Enerji A.Ş. 2. Ekvator Perakende Enerji Ticaret A.Ş. 3. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners) |
Submission Date | 2022-05-30 |
Global Stakeholder Consultation Period |
2022-07-03 to 2022-07-17 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() ![]() ![]() |
Forecasted SDG+ Label | Platinum |
Forecasted Market Eligibility | C+ - Pilot Phase |
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Sav-Ek Solar Power Plant Bundle constructed by Saves Enerji A.Ş. and Ekvator Perakende Enerji Ticaret A.Ş. The purpose of the project is to generate clean energy by using solar power and providing the energy to the Turkish national grid. Sav-Ek Solar Power Plant Bundle consists of 26 individual Unlicensed Solar Power Plants with a capacity of 29.708 MWp / 25.480 MWe in total. The average annual generated energy is expected to be 46,498.5 MWh. The average annual emission reduction will be 30,140.3 tCO2e for the entire crediting period and total emission reduction value 301,403 tCO2e are expected to be reduced. |
---|