PROJECT DETAILS

Project Submission No. S00257
Project Title Sav-Ek Solar Power Plant Bundle
Project Owner (as per PSF & LOA) 1. Saves Enerji A.Ş. 2. Ekvator Perakende Enerji Ticaret A.Ş. 3. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Turkey
Submission Date 30 May 2022
Global Stakeholder Consultation Period 3 Jul 2022 - 17 Jul 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 29,104
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 11, SDG 13
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Sav-Ek Solar Power Plant Bundle constructed by Saves Enerji A.Ş. and Ekvator Perakende Enerji Ticaret A.Ş. The purpose of the project is to generate clean energy by using solar power and providing the energy to the Turkish national grid. Sav-Ek Solar Power Plant Bundle consists of 26 individual Unlicensed Solar Power Plants with a capacity of 26.239 MWp / 25.540 MWe in total. The total installed capacity is 25.540 MWe. The average annual generated energy is expected to be 48,526 MWh After 2020 with all plants activated. and the project will be able to deliver a reduction in emissions of around 29,104 tCO2e (tons of carbon dioxide equivalent) per annual. For the entire crediting period, 291,044 tonnes of CO2 are expected to be reduced.

Additional Information